Collect, Pick and Place Head (CPP) Standard Mode - Placement: Z Axis Up Settings on the CPP Head Student Guide SIPLACE X-Serie and X4I SW70x (AL2) 302 Standard Mode - Placement: Z Axis U p 8.4.14 Standard Mode - Placemen…

100%1 / 522
Collect, Pick and Place Head (CPP)
Pickup and Placement Cycle for CPP Standard Mode - Placement: Z Axis Down
301 Student Guide SIPLACE X-Serie and X4I SW70x (AL2)
Standard Mode - Placement: Z Axis D own
8.4.13 Standard Mode - Placement: Z Axis Down
Axis controller:
Enable signal for "light barrier down" function
LB down switches:
End signal Z axis positioning downwards;
Digital pressure control valve: switches "Air blast ON"
Pickup/placement position; air blast threshold "place component" reached? Yes
NOTICE
Since the travel paths for each axis can be calculated and are therefore known, the next action
(e.g. starting the Z axis) is started via position flags. These are sent by the predecessor action
(e.g. star axis). This enables the Z axis to start moving 10 ms earlier (depending on the
definition). It no longer needs to wait for the end position signal from the star axis. The end
position signal is therefore no longer in use.
Detailed component placement procedure: Z Axis Down
In this mode (light barrier down) the placement force at
the placement head is around 2N.
End position signal for X and Y axes--> Z axis starts:
Positioning of Z axis downwards
Component sensor checks component. Z axis
measurement value - nozzle length "with component"
- threshold reached? Yes
End position signal for star axis:
Performsing vacuum test "before placement".
"Vacuum closed" threshold reached? YES to
determine whether the component is held by holding
force on the nozzle.
Collect, Pick and Place Head (CPP)
Standard Mode - Placement: Z Axis Up Settings on the CPP Head
Student Guide SIPLACE X-Serie and X4I SW70x (AL2) 302
Standard Mode - Placement: Z Axis U p
8.4.14 Standard Mode - Placement: Z Axis Up
Optical Nozzle Query
8.4.15 Optical Nozzle Query
After the reference run, the gantries move into the wait position and performs the first nozzle
scanning. During the production, a nozzle scanning run is performed after 350 head cycles (can be
set by SIPLACE service if required) and after the completion of the board currently processed. This
ensures that the nozzle quality is continually checked during the production process:
All nozzles listed in the scan parameters of the station database will be measured by the
component camera.
If there is any deviation from the defined size, shape or brightness, the machine will show the
message: Nozzle worn down or contaminated.
Tiny nozzles may touch the solder paste or the glue because of component shift and the minimum
component height.
The number of components per segment (number of head cycles), after the next nozzle query has
been performed, should be adjusted to the customer's process requirements. This check is always
performed after completing PCB processing.
Settings on t he CPP Head
8.5 Settings on the CPP Head
Board D escriptio ns
8.5.1 Board Descriptions
See also
7.5.1.1 Head Adapter for C&P20A on X Machines with A364 [ ➙ 248]
8.5.1.1 Base Adapter for CPx on SX4 Machines with HCU [ ➙ 303]
8.5.1.2 Head Interface on SX4 Machines with HCU [ ➙ 304]
Detailed component placement procedure: Z Axis Up
LB down switches:
▪...
Pickup/placement position; air blast threshold "place
component" reached? Yes
Start signal for upwards movement
Z axis starts:
Z axis positioning upwards
Head firmware:
Digital pressure control valve: switches air blast OFF
Reset "light barrier down" signal
Axis controller:
Z axis measurement value for nozzle "empty" and
Z axis in safe area =
Enable X, Y gantry axes.
Vacuum query:
Vacuum threshold for holding circuit reached? Yes
Star axis starts.
NOTICE
The nozzle quality check can be configured in four different levels, via the station interface.
Collect, Pick and Place Head (CPP)
Settings on the CPP Head Board Descriptions
303 Student Guide SIPLACE X-Serie and X4I SW70x (AL2)
Base Ada pter for CPx on SX 4 Machines with HCU
8.5.1.1 Base Adapter for CPx on SX4 Machines with HCU
Base adapter for CPx [03045647-xx] on SX4 machines with HCU
Legend
Meaning of LEDs H1 - H9
1 X3 Connection to the head interface board
C700
5 Test connector for FPGA
2 X4, X14, X15 – connector for HCU 6 X1-X2 flat ribbon connection for CPP or
C&P20
3 Switch S1 intermediate circuit voltage
Z axis
40V C&P20 (switch top)
150V CPP(switch bottom)
7 X6 Programming connector for FPGA
4 LED H3- H9 8 X7 Test connector HCU
H1 OK Status display for the component sensor
H2 RS232 Shines when the programming connector for the HCU1 is connected (not
designed for Service)
H3 1V5 Voltage monitor 1.5 V, shines red in event of errors
H4 3V3 Voltage monitor 3.3 V, shines red in event of errors
H5 5V Voltage monitor 5 V, shines red in event of errors
H6 15V Voltage monitor 15 V, shines red in event of errors