4OM-1603-007_w.pdf - 第100页

4OM-1603 1-45 3. Maintenance Spots : Chap.1 1007-003 3.2.10 Conveyor Section Type H PT1/8 Lubrication Work Example Linear Guides (2 locations) Every 3 Months Cleaning and Lubrication (DAPHNE EPONEX GREASE No. 1) Required…

100%1 / 379
4OM-1603
1-44
3. Maintenance Spots : Chap.1
1007-003
3.2.9 PCB Positioning Section
Ball Screw
Ball Screws
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 10 minutes
Wipe off old grease with a rag and apply new
one with a syringe.
Take ample care not to leave any
waste threads after cleaning.
Grease should be applied every 3 months after
the initial month.
Use No. 19 (brown) nozzle.
Note
No. 19
Ball Screw Splines
(Grease Nipple 6 locations)
Every 6 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 10 minutes
(1) Wipe off old grease with an oiled rag.
Take ample care not to leave
any waste threads after
cleaning.
(2) Attach the SPK-3C attachments to a hand
grease gun and supply new grease to the
grease nipples with the hand grease gun.
Notice
SPK-3C
Upper Surface of Backup Table
Every Week Cleaning
Required Time: 2 minutes
Remove foreign substances and unrequired components
and suck dirt and dust with a vacuum cleaner.
Notice
(2 locations)
F4A32
4OM-1603
1-45
3. Maintenance Spots : Chap.1
1007-003
3.2.10 Conveyor Section
Type H
PT1/8
Lubrication Work Example
Linear Guides (2 locations)
Every 3 Months Cleaning and Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Wipe off old grease with an oiled rag.
Take ample care not to leave any
waste threads after cleaning.
Use type H nozzle.
Notice
Note
Attach the H-type attachments to a hand grease
gun and supply new grease to the grease nipples
with the hand grease gun.
F4A33
4OM-1603
1-46
3. Maintenance Spots : Chap.1
1007-003
Support Pin Detection Sensors
Support Pin Detection Sensors (2 locations)
Every Week Cleaning
Required Time: 1 minute
Clean the support pin detection sensors with
a rag.
F4A34