4OM-1603-007_w.pdf - 第83页
4OM-1603 1-28 3. Maintenance Spots : Chap.1 1012-003 W ARNING Pay close attention to the cutter blade during the maintenance work. • Lack of attention will result in a hand injury, etc. Wear gloves and take the greatest …

4OM-1603
1-27
3. Maintenance Spots : Chap.1
1003-003
3.2.6 Feeder Cart Section (Cutter)
Remove the screw on the other side. (12 locations)
Cutter Box Inside
Every Week Cleaning
(1) Detach the bank feeder change cart.
(2)
(3)
Use a vacuum cleaner with a narrow air opening
in the nozzle.
Note
Narrow Air Opening in Nozzle End
(Recommended)
Required Time: 10 minutes
Remove the screws (12 locations) on the cutter unit in
the bank feeder change cart and remove the cover.
Clean any debris or dust inside the cutter unit using the
vacuum cleaner.
F4A20

4OM-1603
1-28
3. Maintenance Spots : Chap.1
1012-003
WARNING
Pay close attention to the cutter blade during the
maintenance work.
•
Lack of attention will result in a hand injury, etc.
Wear gloves and take the greatest care in
performing the work.
•
Be sure to attach the cutter blade cover to the
cut unit during the maintenance work for safety
purposes.
Linear Guides
Every 3 Months Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 10 minutes
(1) Remove 6 screws.
(2)
Use Type N nozzle.
Type N
Note
Wipe old grease out using a rag and apply new grease
onto the linear guide (upper and lower sides).
(1) Remove 6 screws.
(2) Insert the nozzle in the hole and supply grease.
(3) Wipe out overflowed grease.
(DAPHNE EPONEX GREASE No. 1)
Required Time: 10 minutes
Every 3 Months Lubrication
Needle Bearing
Use Type P nozzle.
Type P
Note
F4A21

4OM-1603
1-29
3. Maintenance Spots : Chap.1
1012-004
WARNING
Pay close attention to the cutter blade during the
maintenance work.
•
Lack of attention will result in a hand injury, etc.
Wear gloves and take the greatest care in
performing the work.
•
Be sure to attach the cutter blade cover to the
cut unit during the maintenance work for safety
purposes.
Attachment Position of
Cut Unit Fixing Jig
Flat Ring
Every Year Replacement
Required Time: 10 minutes
(1) Remove 11 screws and detach the cover.
(2) Use the cutter unit fixing jig with the tape clamp closed to fix the urethane clamp section.
(3) Loosen and remove the seal-cover bolt (6 locations) in the order of No. 1 to No. 6,
using a wrench.
(4) Change the flat ring.
(5) Put the shield cover and attach the bolts (6 locations) on it.
(Attach it using the torque driver attached to the line accessory.)
(Tightening Torque : 18.6 to 22.6 Ncm (1.9 to 2.3 kgfcm))
Bolts
Bolts
F4A22