4OM-1603-007_w.pdf - 第86页
4OM-1603 1-31 3. Maintenance Spots : Chap.1 1012-005 (2) Remove the tape guide. (1) Remove the front safety bar and take out the cutter from the cart. (3) Remove five screws. (4) Replace the fluorine sheet. Fluorine Shee…

4OM-1603
1-30
3. Maintenance Spots : Chap.1
CAUTION
Whentheatringiscut,takecarenottogetinjured
by the commercially available cutter.
1012-002

4OM-1603
1-31
3. Maintenance Spots : Chap.1
1012-005
(2) Remove the tape guide.
(1) Remove the front safety bar and take out the cutter
from the cart.
(3) Remove five screws.
(4) Replace the fluorine sheet.
Fluorine Sheet
Every Year Replacement Required Time: 15 minutes
Front Safety Bar
Catch Locks
Removed fluorine sheet
(a) When the cutter is setup on the cart, fix the two
connectors securely.
(b) When the cutter is setup on the cart, push the cutter
into the end and fix it securely using the catch locks
(two locations).
(c) Do not forget to attach the front safety bar.
Note
F4A23

4OM-1603
1-32
3. Maintenance Spots : Chap.1
Note
(3) Attach the cutter blade cover.
(1) Remove the front safety bar and take out the
cutter from the cart.
② ⑥①
④ ⑤③
③
②
⑥
⑤
Front
Safety Bar
Urethane Clamp
(2) Remove the cutter section covers (6 locations).
(4) Remove the screws on the right and left of the clamp
lever base.
(5) Remove the clamp lever together with the clamp
lever base.
(6) Remove the clamp lever from the clamp lever base
and replace the clamp lever by new one.
Remove
the screw.
Remove the screw also on the other side.
Every Year Replacement Required Time: 30 minutes
(b) When the cutter is setup on the cart, push the cutter into the end and
fix it securely using the catch locks (two locations).
(c) Do not forget to attach the front safety bar.
(a) When the cutter is setup on the cart, fix the two connectors securely.
F4A24
1012-004