YSM20R_YSM20WR_Ope_E.pdf - 第220页
3-32 3 Flow fr om starting up machine to production 1.13 Resuming operation from the stopped point If resuming to mount a board that has been reset due to an error occurrence in the middle of production or mounting the c…

3-31
3
Flow from starting up machine to production
e
6
Press the emergency stop button.
When the emergency stop screen appears, press the emergency stop button and then press the [OK]
button.
7
Turn off the main switch of the machine.
When completing the power shutdown process, a message “It is now safe to turn off your computer.”
appears on the screen. When confirming the message, turn the main switch to the left at the lower right
of the main machine to shut it down.
c
CAUTION
• Do not turn off the main switch unnecessarily while ignoring the set procedure. Otherwise, destruction of data or
damage to devices could occur.
• Do not turn on the main switch immediately after turning it off. Otherwise, such an operation could lead to damage
to the control board. Be sure to wait for 2 seconds or so after powering off the machine before turning it on again.

3-32
3
Flow from starting up machine to production
1.13 Resuming operation from the stopped point
If resuming to mount a board that has been reset due to an error occurrence in the middle of production or
mounting the components on a particular block or at a particular mounting point, use this “Halfway Continue
(Resuming operation from the stopped point)” function. Note that this function can be used just for the first
board after the operation is resumed, with routine mounting operation beginning from the next board.
1
Press the [Halfway Continue] button.
Pressing the [Halfway Continue] button on the “Setup” screen calls up the “Save abort information”
screen.
2
Read out the aborted information that has been saved.
After confirming the “Save Date/Time” and other details on the “Save abort information” screen, press
the [OK] button to open the “CONFIRMATION OF BOARD FIX” screen and then open the “Halfway
Continue” screen.
n
NOTE
• When system error occurred and machine stopped due to power outage, the error message "Check the inside of
machine" may appear n addition to “CONFIRMATION OF BOARD FIX” screen. In this case, follow the message and
check machine inside.
• When boards are being produced using both lanes of YSM20WR dual-lane, select the lane from the "Lane Select"
drop-down list in the "Halfway Continue" dialog box, and then resume operation.
Halfway Continue
[Setup] screen -"Halfway Continue" screen
“Save abort information” screen
Check the aborted time
and details.
[Halfway Continue] button
“Halfway Continue” screen
24323-KMK-00

3-33
3
Flow from starting up machine to production
3
Check and edit the state of mounting.
Check the state of component mounting of the aborted information. For instance, if the machine has
stopped due to an error after a head picked up a component, the mounting information column
indicates “Unknown”.
After selecting the mounting points to be checked, press the [Trace] button to move the head unit
(camera) to the actual mounting position. While checking each of the mounting points on the board
with the camera, pressing the [Mount] check button changes the setting of the selected mounting
status.
After changing the "Unknown” positions to “Done” or “Undone”, press the [OK] button to exit the screen.
n
NOTE
Pressing the [OK] button while an “Unknown” mounting point still remains, an error message appears. The “Halfway
Continue” screen cannot be closed.
Editing on “Halfway Continue” screen
"Halfway Continue" screen
[Mount] check button
[Trace] button
Mounted status
Done Undone Unknown
Background: Yellow
Select “Offset No.”
24324-KMK-00
n
NOTE
When using the block offset function for a multi-board, for instance, selecting the “Offset No.” enables to edit the
state of components mounting per block. However, the editing on the “Halfway Continue” screen is available only
when mounting the first board.
4
Resume the automatic operation.
Press the [START] button on the operation panel to resume the automatic operation. The machine starts
mounting the components at the mounting points set to “Undone” of the first board after resumption.