YSM20R_YSM20WR_Ope_E.pdf - 第99页
1-66 1 Unit names and functions n Procedure for changing ionizer installation angle T he ionizer installation angle can be changed with YSM20R. TIP Guideline for ionizer installation angle (in the case of the front ioniz…

1-65
1
Unit names and functions
8.2 Ionizer
The ionizers are installed to defuse the static electricity.
Note that the performance and capability of the ionizer to remove static electricity depends on the operating
environment or the materials and shape of the items that the static electricity is removed.
Such performance or capability is not guaranteed.
The ionizer of this machine is installed behind the machine safety cover. The ionizer when shipped from the
factory faces around the component pick up position of the feeder. The installation angle can be changed
according to the specifications of the board and the components.
Ionizer
Ionizer
POWER
ALARMRUN
CLEANING
RESET
CLEANING TIMER
T SELECT
Ionizer indicator panel
23133-KMK-00
n
Ionizer indication
POWER The green LED lights up when the electric power is supplied normally.
RUN The green LED stays on during the normal operation.
ALARM
The red LED lights up if the discharge needle has deteriorated or an inner unit/
device is experiencing an error. The machine main body also generates an
alarm.
CLEANING TIMER
When the duration of time set up by operating the trimmer of T.SELECT has
expired, the “CLEANING” yellow LED lights up. Pressing the “RESET” button
makes the yellow LED go out. * Note that this timer is not set up at the time of
shipping from the factory.
n
NOTE
See the manufacturer’s operation manual for the detailed specifications of the ionizer.

1-66
1
Unit names and functions
n
Procedure for changing ionizer installation angle
The ionizer installation angle can be changed with YSM20R.
TIP
Guideline for ionizer installation angle (in the case of the front ionizer)
0 degree : Near the feeder components pickup position
Upper 15 degrees : Near the conveyor frame on the side of operator at conveyor transfer position (for a machine
with the reference point on the operator side of the conveyor)
Ionizer installation angles
Ionizer
Tape feeder
15 degrees
Feeder component pick up positionConveyor frame (operator side)
Installation angle: 15 degrees
Installation angle: 0 degree
(when shipping)
23134-KMK-00
e
1
Power off the ionizer.
1. Press the emergency stop button and open the machine safety cover. This turns off the electrical
power supply to the ionizer.
2. Check that the green LED of “POWER” of the ionizer is off.
w
WARNING
DO NOT TOUCH THE IONIZER DISCHARGE METER.

1-67
1
Unit names and functions
2
Loosen the ionizer mounting bolts.
Loosen the mounting bolts on the right and left of the ionizer with a hex wrench (5).
Loosening ionizer mounting bolt
Ionizer mounting bolt
23135-KMK-00
3
Adjust the ionizer installation angle.
1. Tilting the ionizer causes the right and left angle indicators to move simultaneously. Tilt the ionizer so
that the desired angle aligns with the target adjustment mark (o).
2. While holding the ionizer so as not to change the angle, tighten one of the two mounting bolts.
3. Check that the angles are the same on the right and left. Tighten the other mounting bolt.
Adjusting ionizer installation angle
Mark for angle
adjustment guideline
23136-KMK-00
n
NOTE
The ionizer installation angle can be changed between -8.5 and 15 degrees.