YSM20R_YSM20WR_Ope_E.pdf - 第54页

1-21 1 Unit names and functions 3.4.3 Automatic nozzle shaft blow procedure T he nozzle shaft blow can be automatically performed at the desired timing. T he following is the setting procedure. 1 Pr ess the [Machine] but…

100%1 / 229
1-20
1
Unit names and functions
4
A confirmation screen appears asking you to make a final check.
Check the contents of the screen and press the corresponding button.
[YES] : Performs nozzle shaft blow of the selected nozzles.
[NO] : Returns to the "Nozzle Setting" screen.
[CANCEL] :
Closes the dialog box and returns to the [Unit]-[Head] screen without performing nozzle shaft blow.
“RECONFIRMATION OF CLEANING BLOW” screen
24105-KMK-00
n
Safety checks
The nozzle shaft blow function also contains the following safety checks.
Nozzle shaft blow interruption alarm
The head immediately rises if operation stops during nozzle shaft blow due to emergency stop or an interlock triggering.
If the head rises but the air blow still continues, then the nozzle might come loose from the head. To prevent this, a
confirmation dialog box appears if the machine operation stopped during nozzle shaft blow.
Nozzle sensors to check whether a nozzle is left on the blow station
The nozzle shaft blow function forces high-pressure air through the nozzles during cleaning, so the nozzles might come
loose from the head if machine operation stops during nozzle blow. If a nozzle comes loose from the head and remains
on the blow station while the automatic operation still continues, then the nozzle left on the blow station might interfere
with other heads or with the multi-max unit. Instead of nozzle detection sensor, this machine uses a vacuum pump
flowrate sensor to check for missing nozzles.
This check occurs at Z-axis UP completion following a shaft air-blow operation.
If a missing nozzle is detected, an error displays and all axes are stopped.
1-21
1
Unit names and functions
3.4.3 Automatic nozzle shaft blow procedure
The nozzle shaft blow can be automatically performed at the desired timing.
The following is the setting procedure.
1
Press the [Machine] button.
The "VmSpec" screen appears.
2
Select the "Schedule Specification".
Select the "Schedule Specification" on the left side of the “VmSpec” screen.
n
NOTE
The “Schedule Specification” is an item set up in the machine that requires the authorization at the administrator level.
Open the “VmSpec” - “Schedule Specification” screen
[Machine] button VmSpec screen
Select the “Schedule Specification”
24106-KMK-00
1-22
1
Unit names and functions
3
Set the nozzle shaft blow.
1. Select the “Shaft Cleaning Blow” from the Check Item drop-down list.
2. Tick the checkbox of the “Check Execution”.
3. (If the machine has the nozzle station) Select the nozzle for nozzle shaft blow from "All Nozzle" or
“Only Using Nozzle” specified by the board data.
4. Set the “Executive Condition” and the “Cycle Condition”.
5. Press the save icon on the upper left corner of the screen to save the settings.
6. Press the close icon [x] on the upper right corner of the screen to exit the “VmSpec” screen.
Setting automatic nozzle shaft blow
“VmSpec” screen
1. Select the “Shaft Cleaning Blow” from the Check Item drop-down list.
2. Tick the checkbox of the “Check Execution”.
5. Press the save icon.
3. If the machine has the nozzle station, select "All Nozzle" or
“Only Using Nozzle”.
4. Set the “Executive Condition” and “Cycle Condition”.
24107-KMK-00
4
Reload the board data.
The automatic nozzle shaft blow setting is reflected after reloading the board data.