Machine Operati on Manual Revision L / February 2020 Page 197 of 2 00 Figure 222 : Bond Sequence, Initializing 5. Pres s and hold the “ Teach ” button on teac h pendant to rec ord the fi rst bond step. Release th e “ Tea…

Machine Operation Manual
Revision L /
February 2020
Page 196 of 200
3. Set the values for Approach distance, Material Thickness, Speed, Acceleration, and
Deceleration.
Figure 220: Bond Manager Recipe
4. Make sure Setup Mode is set to “Teach” and Select the “Begin” button.
Figure 221: Bond Manager "Begin"
The Initializing screen will be shown.

Machine Operation Manual
Revision L /
February 2020
Page 197 of 200
Figure 222: Bond Sequence, Initializing
5. Press and hold the “Teach” button on teach pendant to record the first bond step.
Release the “
Teach” button to stop the motion and start to record the first dwell.
Figure 223: Teach Bond Sequence
The Step Number, Material Thickness, Approach Distance, and Remaining Distance are
shown when a step movement is being recorded.

Machine Operation Manual
Revision L /
February 2020
Page 198 of 200
Figure 224: Teaching in Progress
The Dwell time is shown when a dwell step is being recorded.
Figure 225: Current Dwell
6. Repeat the procedure to record additional bonding steps. The values will be shown
in the table.
7. Press the “Axis” button on the teach pendant when the wet out is complete. This
will save the value.