PathMaster-REV-L-4.5-1.pdf - 第200页
Machine Operati on Manual Revision L / February 2020 Page 200 of 200 Bonding in Auto Cycle When you u se Auto Cyc le to make parts, the fol low screen s are sho wn in Porta l. Figure 228 : Bonding Cy cle Runni ng When th…

Machine Operation Manual
Revision L /
February 2020
Page 198 of 200
Figure 224: Teaching in Progress
The Dwell time is shown when a dwell step is being recorded.
Figure 225: Current Dwell
6. Repeat the procedure to record additional bonding steps. The values will be shown
in the table.
7. Press the “Axis” button on the teach pendant when the wet out is complete. This
will save the value.

Machine Operation Manual
Revision L /
February 2020
Page 199 of 200
Figure 226: Material Wet Out
The screen below will be shown when the complete bonding sequence has been taught.
Figure 227: Bonding Complete

Machine Operation Manual
Revision L /
February 2020
Page 200 of 200
Bonding in Auto Cycle
When you use Auto Cycle to make parts, the follow screens are shown in Portal.
Figure 228: Bonding Cycle Running
When the part placement is complete the following screen is shown.
Figure 229: Place Routine Complete
Additional steps of the bond cycle are customer specific and may have additional screens.