2OM-1075-002.pdf - 第225页

AHB01ESPP (2) Press the [ENABLE] button (entitled "TEST RUN") in the "Run Mode" tab sheet ("OPN. MODE" Submenu Window). Refer to "3. "OPN. MODE" Window (Submenu)" in &quo…

100%1 / 469
AHB01ESPP
8. Running-In Operation
After the machine has been stopped for a long period of time, perform a
running-in operation for approx. 30 minutes to smoothly start up the
machine.
Operation Procedure
(1) Select the required pattern program and perform the program and
product change operations.
Refer to "7. "PRGM. CHG." Window (Submenu)" in "Section 5"
for the program and product change operations.
Observe the following to prevent any deficiency
in the running-in operation.
Do not set any P.C.B. to be produced on the ma-
chine.
The feeders can be installed on the feeder bases.
However, it should be noted that the settings of the
test run (described hereinafter) must be correctly
made.
8. Running-In Operation
Note
0308-002 5-58
CAUTION
AHB01ESPP
(2) Press the [ENABLE] button (entitled "TEST RUN") in the "Run Mode"
tab sheet ("OPN. MODE" Submenu Window).
Refer to "3. "OPN. MODE" Window (Submenu)" in "Section 5"
for the detailed information on the "OPN. MODE" window
(submenu).
Fig. 2E49 "Run Mode" Tab Sheet
(3) Press the "Test Run" tab in the "OPN. MODE" window (submenu).
The "Test Run" tab sheet appears inside the window.
Fig. 2E50 "Test Run" Tab Sheet
Note
*1
[ENABLE] Button
TEST RUN
8. Running-In Operation
*3
*1
*2
0308-003 5-59
AHB01ESPP
(3-1) Select the desired test pattern in the combo box (*1) under the
title "TEST PATTERN".
Select "Pattern1", "Pattern2", or "Pattern3".
(3-2) Turn on the check boxes in the "Test Run" group box (*2) to set
the test run modes. After that, press the [Set] button (*3).
Recommended Selections
Turn on all check boxes as follows.
9 Comp. Missing Dsbl.
9 Vacuum Sensor Err. Dsbl.
9 Comp. Vertical Dsbl.
9 P.C.B. Location Dsbl.
9 P.C.B. Transfer Dsbl.
9 Comp. Ep Data Dsbl.
9 Machine Adjustment Dsbl.
9 Vacuum/Air Blow Dsbl.
9 P.E.C. Dsbl.
9 Comp. Recognition Dsbl.
9 P.E.C. Gain/Lvl. Disp. Dsbl.
9 Pickup/Place. Dsbl.
9 Component Feed Dsbl.
9 Nozzle Exchange Err. Dsbl.
9 Shtg. Of Comp. Dsbl.
9 Tray Matrix Update Dsbl.
9 Tray Comp Feed Dsbl.
9 Tray Pll Det Dsbl.
9 Feeder Conn Conf Dsbl.
Wrong selections (test run in wrong modes) will cause
various deficiencies such as component picks by
vacuum nozzles, scattering of components, or colli-
sion with the chute, etc.
8. Running-In Operation
0308-002 5-60
CAUTION