2OM-1075-002.pdf - 第77页

0107-001 3 - B AHB01ESPP

100%1 / 469
Section 3
Program Change Operation
This section describes the procedure of program change
operation for the model to be produced for the first time.
0308-002 3-A AHB01ESPP
0107-001 3-B AHB01ESPP
1. Scope
Follow the procedure below to perform a program change operation.
2. Preparation for Program Change Operation
2.1 Preparation for Component Library
2.2 Creation of Pattern Program for Production Model
2.3 Registration of Pattern Program for Production Model
2.4 Preparation for Nozzles
3. Program Change Operation
3.1 Selection of Current Pattern Program
3.2 Setting of P.C.B. Support Pins
3.3 Conveyor Width Adjustment
3.4 P.C.B. Positioning
3.5 Preparation for Feeders
3.6 P.E.C. Recognition Test
3.7 All Clear Operation of Offset Data "Feeder B"
3.8 Re-Verification of Component Library
(1) Pick-Up Location Teaching Function
(2) Component Recognition Test
4. Confirmation of Component Placement
4.1 Setting of Operation Mode
(1) Confirmation and Setting of Alternate Designation
(2) Confirmation and Setting of Operation Mode Setting
4.2 Component Placement Test
Fig. 2C1
1. Scope
0206-003 3 -1 AHB01ESPP