00196044-05 - sg x und x4i fse_en.pdf - 第253页
C&P20A Compressed Air Supply to the C&P20A Reference Run for C&P20A Head S tudent Guide (FSE) SIPL ACE X Series and X4I Edition 01/2009 EN C&P20A 253 7.3 Reference Run for C&P20A Head 7-8: Reference r…

C&P20A
Overview Compressed Air Supply to the C&P20A
Student Guide (FSE) SIPLACE X Series and X4I
C&P20A Edition 01/2009 EN
252
7.2.5.2 Overview of Vacuum Supply
7-7: General overview of the vacuum function
Legend
RED Vacuum BLUE Compressed air (air blast)

C&P20A
Compressed Air Supply to the C&P20A Reference Run for C&P20A Head
Student Guide (FSE) SIPLACE X Series and X4I
Edition 01/2009 EN C&P20A
253
7.3 Reference Run for C&P20A Head
7-8: Reference run for C&P20 head
The C&P20 head has 22 axes: the Z axis, the star
axis and 20 independently working DP axes, plus
the X and Y axes for the gantry. Before starting
production, all axes must be initialized, so that the
axis controller can locate their actual mechanical
positions. The software start procedure first loads
the DP master firmware and then rotates the DP
axes into the 0° position.
General Procedure
The reference run for the individual axes can
be optimized so that the X, Y, star and all DP
axes visibly start at the same time. As can be
seen in the flow chart, only the Z axis is moved
as the last axis.

C&P20A
Reference Run for C&P20A Head Preparing the Z Axis Reference Run
Student Guide (FSE) SIPLACE X Series and X4I
C&P20A Edition 01/2009 EN
254
7.3.1 Preparing the Z Axis Reference Run
7.3.2 Star Axis Reference Run
7-9: Preparing the Z axis reference run (C&P20A)
The Z axis return unit ensures that the Z axis is in
a safe position (Z up) as soon as the machine is
started. This is the requirement for starting the star
axis reference run.
7-10: Star axis reference run
The star axis rotates in an anticlockwise direction
(1) to the zero pulse of the incremental encoder.
After reaching the zero pulse, the zero point
correction is loaded. The star axis rotates in a
clockwise direction (2) (according to the zero point
correction factor) until the zero point correction
position is reached and then sets the counter to 0
digits.
Segment number 1 is now in pickup / placement
position.