Head Modularity Production requirements Head Modularity S tudent Guide (FSE) SIPL ACE X Series and X4I Edition 01/2009 EN Head Modularity 521 13-3: Decision criteria for selection of position and camera type s of CPP hea…

100%1 / 632
Head Modularity
Head Modularity Production requirements
Student Guide (FSE) SIPLACE X Series and X4I
Head Modularity Edition 01/2009 EN
520
13.3 Head Modularity
13.3.1 Production requirements
Which decisions must be taken before head exchange?
13-2: Decisions before head exchange
NOTE: Reconfiguration of a SIPLACE X machine
The new configuration of the SIPLACE X machine should be maintained for a longer production
time for that product and should not be changed again on a weekly basis, as machine
reconfiguration and recalibration can take at least a day, depending on the machine type.
NOTE:
When using mixed placement, you need to decide which camera type is to be used for the CPP
head to achieve the widest possible component spectrum.
Head Modularity
Production requirements Head Modularity
Student Guide (FSE) SIPLACE X Series and X4I
Edition 01/2009 EN Head Modularity
521
13-3: Decision criteria for selection of position and camera types of CPP head
NOTE:
For the option Head Modularity, use the retrofitting guide "Head Reconfiguration Kits".
Head Modularity
Head Modularity Head exchange
Student Guide (FSE) SIPLACE X Series and X4I
Head Modularity Edition 01/2009 EN
522
13.3.2 Head exchange
13.3.3 Calibration
SIPLACE X C&P
X Calibrate zero point correction both gantries.
X Calibrate PCB camera
X Calibrate C&P head
X Component Camera
Segment offset 2
Segment offset 1
X Calibrate nozzlechanger (inclusive automatic pick up height)
NOTE:
See Chapter "Calibration".