EPU Instruction M anual C hapter 4 Creating a Production Progr am 4- 96 4.2.1.2 A cti ve feeder in Component supply count The initial value of the com ponent supply count (us ed or unused) is set f or m echanical and ele…

100%1 / 235
EPU Instruction Manual Chapter 4 Creating a Production Program
4-95
(2) [Change] button
Set the supply count of the feeder for each component.
Menu item Description
Auto The system automatically sets the number of components that are specified to
be supplied. The number of feeders is optimized within the upper limit set at
initialization.
It is regarded that the available number of reels for components and the
available number of trays are not limited.
Manual This radio button allows you to change the number of components to be
supplied manually. The Optimizationutility assigns the feeders and trays
according to the number of components that are specified to be supplied.
Enter the number of feeders
Unused The system sets the number of components to be supplied to “0”.
The Optimizationutility does not use specified components for relevant type
feeder and tray.
Note that you cannot use the [Unused] buttons in both the Mechanicaland
“Electricareas at the same time
EPU Instruction Manual Chapter 4 Creating a Production Program
4-96
4.2.1.2 Active feeder in Component supply count
The initial value of the component supply count (used or unused) is set for mechanical
and electric feeders with various tape width levels.
The settings become effective only when component data is created newly.
For example, if there are only electric feeders available, the initial values of the
mechanical feeders are set at Unused. As a result, it is not necessary to change the
component supply count every time component data is created.
Click [Optimization] from the menu bar and click [Active feeder in Component supply
count].
The following Default Active Feeder Setupscreen will appear.
Check on feeder types you want to use. Conversely, check off feeder types you do
not want to use.
You cannot check off all feeder type check boxes at once.
The settings you have changed become effective when new component data is
created.
If you create new component data after you have changed the settings and the check
box for the feeder type with relevant tape width is checked off, the initial value of the
component supply count is set to Unused”.
EPU Instruction Manual Chapter 4 Creating a Production Program
4-97
4.2.1.3 Setting the optimization conditions
The optimization result may vary depending on the settings on the Component supply
countdialog box described above and those on the Optimizationdialog box described
below. Set the optimization conditions of a production program only after understanding
the descriptions below well.
When you click the [Optimization]/[Optimization] commands from the menu bar, the
Assignments screen appears.
Set the six categories of conditions including the “Assignments” option.
Click this tag to change the screen for the corresponding option.
Option Description
Assignments Specifies the option to be checked with the Optimization utility when it assigns a
nozzle or Pick data.
Area Specifies the area to which a feeder can be assigned.
Place order Specifies the option to be used for changing the component placement order.
Model option Specifies the option unique to the model.
Feeder option Specify the options related to the feeder layout.
Non-stop option JX-350 is not applicable to the non-stop option.
This button registers new settings as the initial
values. The new settings will be displayed in the
beginning when the system is booted the next time.
This button invalidates your registered
settings and restores the standard
settings (initial values of the machine).
This buttons executes the
optimization function.
This button stores your settings, and
closes this screen.