88192277-01-19 - Micron Technical Reference V9 Volume 4.pdf - 第251页

TRANSPORTATION - MAJOR RELOCATION MACHINE ASSEMBLY Chapter Issue 5, Nov 19 Technical Reference Manual 42.85 High Throughput Conveyors (HTC) Auxiliary Conveyors The following procedure details how to install the HTC auxil…

100%1 / 310
TRANSPORTATION - MAJOR RELOCATION
MACHINE ASSEMBLY
42.84 Technical Reference Manual Chapter Issue 5, Nov 19
4. Fit the monitor bracket on to the monitor bracket shaft.
5. Fit and secure the monitor to the monitor bracket.
6. Connect the following cables to the monitor:
• Monitor Power Cable (DC)
•VGA Cable
7. Place the keyboard on the bracket and feed the keyboard cable into the
machine.
8. Locate the free floating USB connector inside the right hand side of the
machine, behind the front panel.
9. Connect the keyboard.
10. Refit the front cover.
Monitor Bracket
Monitor Bracket Shaft
Securing screws
Monitor
Securing screws
TRANSPORTATION - MAJOR RELOCATION
MACHINE ASSEMBLY
Chapter Issue 5, Nov 19 Technical Reference Manual 42.85
High Throughput Conveyors (HTC)
Auxiliary Conveyors The following procedure details how to install the HTC auxiliary conveyors to
the machine. This installation procedure is for a machine product transfer in the
left to right direction.
To install the auxiliary conveyors, remove the left and right safety covers and
the following panels (as detailed in the Covers chapter):
• Type 1 covers - front and rear corner panels and the centre side panel on
both sides
1. Remove the four auxiliary conveyor securing bolts from the holes in the
machine frame (two on either side).
Auxiliary Conveyor Securing Bolts
Machine Frame
TRANSPORTATION - MAJOR RELOCATION
MACHINE ASSEMBLY
42.86 Technical Reference Manual Chapter Issue 5, Nov 19
2. On the right hand side of the machine, align the holes in the right hand
auxiliary conveyor mounting bracket to the holes in the machine frame and
refit the auxiliary conveyor securing bolts.
NOTE
The right hand auxiliary rail has two pneumatic solenoids mounted on its
front rail, the left hand auxiliary rail only has one.
3. Align the auxiliary conveyor to the print station rails and tighten the securing
bolts.
4. On the left hand side of the machine, align the holes in the left hand auxiliary
conveyor mounting bracket to the holes in the machine frame and refit the
auxiliary conveyor securing bolts.
5. Align the auxiliary conveyor to the print station rails and tighten the securing
bolts.
6. Connect the following to the left hand auxiliary conveyor:
• M27PL07 to M27SK07 on the rear rail
• M27PL06 to M27SK06 on the front rail
• Clip M27SK05 into its bracket on the front rail and connect M27PL05 to
M27SK05
• Electrical connection to M27SOL02 (pneumatic solenoid) on the front rail
• Pneumatic feed to the input connector of M27SOL02
Auxiliary Conveyor Securing Bolts
Auxiliary Conveyor
Mounting Bracket
Machine Frame