00196693-03_UM_SX4DX4_SR706_EN.pdf - 第227页
User Manual SIPLACE SX4/DX4 4 Setting up and commissioning From software version SC.706.xx V ersion 06/2012 EN 4.3 Setting up the machine 227 4.3.9 Removing the shipping braces The shipping braces are att ached to the li…

4 Setting up and commissioning User Manual SIPLACE SX4/DX4
4.3 Setting up the machine From software version SC.706.xx Version 06/2012 EN
226
4.3.8.2 Aligning the machine with the air cushion transport system
Place the four air cushions from the air cushion transport system under the contact points on
the machine frame.
Raise the machine and align it with respect to the line.
Check the distance from the PCB conveyor system of the adjacent machine. It should be be-
tween 1 mm and 3 mm.
Lower the machine.
4
Fig. 4.3 - 14 Contact positions for the air cushion transport system (example of SX4)
(1) 4 contact points for the air cushion transport system
(1)
(1)

User Manual SIPLACE SX4/DX4 4 Setting up and commissioning
From software version SC.706.xx Version 06/2012 EN 4.3 Setting up the machine
227
4.3.9 Removing the shipping braces
The shipping braces are attached to the linear guides. Each gantry is fastened with two shipping
braces on the X and Y axes.
Remove all the shipping braces from the gantry axes.
If the SIPLACE machine needs to be transported, always fit the shipping braces back onto
the conveyor.
4.3.10 Removing the corrosion protection from the guide rails
The machines were given a corrosion protection treatment before they were delivered.
CAUTION 4
– You should therefore remove the corrosion protection from all the axes and bearings when
you traverse the machine axes for the first time during commissioning.
– Grease all the axes and bearings with the grease described in the maintenance instructions.
If the corrosion protection agent is mixed with the bearing grease on the axes this can greatly re-
duce the service life of the bearings and guide rails.
CAUTION 4
Do not allow any alcohol to enter the guide carriages when you clean the guide rails and scale
rods. Alcohol will damage the bearing grease in the guide carriages.

4 Setting up and commissioning User Manual SIPLACE SX4/DX4
4.4 Adjusting the component trolley to the PCB conveyor height From software version SC.706.xx Version 06/2012 EN
228
4.4 Adjusting the component trolley to the PCB conveyor
height
The component trolley can be easily and quickly adjusted to the following PCB conveyor heights:
900 mm 4
930 mm (standard height) 4
950 mm (SMEMA height) 4
4
Fig. 4.4 - 1 Component trolley
(1) Holes for the transport heights of 900, 930 and 950 mm.
(2) Block
(3) Changeover table
(4) M8 holes for fixing the mounting device