4.3.7.3 Machine foot clearances for the placement machine and WPC5/WPC6
4
Fig. 4.3 - 7 Machine foot clearances for the placement machine and WPC5/WPC6 in millimeters
4.3.8 Integrating the placement machine into the line
Observe the general warnings in section 4.3.1, page 203.
Observe the warnings for transportation of the placement machine in section 4.3.2, page 204.
For details of tools and equipment, refer to section 4.3.5, page 207.
4.3.8.1 Aligning and adjusting the placement machines in the line
With the fork-lift, raise the placement machine until the weight is taken off the machine feet.
Determine the PCB conveyor height for the placement machine in the line and use the hexa-
gon socket head screw to adjust the height approximately.
You may need to fit the machine feet to the relevant PCB conveyor height (see 4.3.6 on page
208).
Position the placement machine on the free location on the line using the fork-lift.
Pay attention to the alignment of the PCB conveyors and check the distance to the previous
placement machine.
a) The value depends on the position of the fixed side.
All dimensions in millimeters.

Instruction manual SIPLACE SX1/SX2 Edition V2 and V3 4 Setting up and commissioning
From software version SC.713.1 Edition 12/2020 4.3 Setting up the placement machine
215
4
4
Use the machine spirit level to align the placement machine in the X and Y directions (see
4.3.9 on page 216).
Align the PCB conveyors with the help of the long auxiliary board. Move the placement ma-
chine to its final position. You must be able to push the long auxiliary board through the PCB
conveyor to the adjacent placement machine with ease and without jamming.
Use the machine spirit level to check the X and Y directions again and adjust the height of the
feet if necessary.
Tighten the machine feet at the clamping screw to a torque of 130 Nm.
Hit the feet with a hammer to check the load-bearing strength of the machine feet.
Use the machine spirit level to check the X and Y directions again.
WARNING
Risk of damage!
If the machine feet on one side hit the ground hard, the fixings may be damaged.
Slowly lower the placement machine.
A second person should look underneath to ensure that all the machine foot touch
the floor at the same time.

4 Setting up and commissioning Instruction manual SIPLACE SX1/SX2 Edition V2 and V3
4.3 Setting up the placement machine From software version SC.713.1 Edition 12/2020
216
4.3.9 Aligning the placement machine with the machine spirit level
4
Fig. 4.3 - 8 Adjusting the placement machine in the X and Y direction - measurement structure
Measurement is performed at gantry 1.
Push the gantry inwards, in the Y direction. The distance of the two bumpers should be ap-
prox. 300 mm (or approx. 4-5 red dots on the linear guide).
Place the support plate (1) onto the gantry so that the 3 support pins lie on the free areas be-
tween the running surface and the magnets. Make sure that the 3 support pins touch evenly.
Place the machine spirit level (measuring accuracy of 0.02 mm) onto the support plate and
measure at 3 points
– The alignment of the Y axis at the loose bearing side and at the fixed bearing side.
– The alignment of the X axis in the middle of the X gantry. The head mount must be in the
middle of the X gantry.
4
300 mm
(1)
(
2)