2OM-1104-001.pdf - 第255页

7. Maintenance (Every 3 Months after Initial Month) NM1: NEW MOL YNOC GREASE No. 1 T able 5A7 Maintenance Spots Description Grease Cleaning Check T ools, Name DWG Nozzles, No. etc. T able Outer Circumference 5A22 Lubrica…

100%1 / 387
Fig. 5A22 R Conveyor Section
Spline Shaft for Width
Adjustment
Clean the shaft with an oiled
rag.
Note: Remove waste thread
if any.
Cleaning
Ball Screw for Width
Adjustment
Clean the screw with an oiled
rag.
Note: Remove waste thread
if any.
Cleaning
Guide Bushing for Width
Adjustment
Clean the bushing with an
oiled rag.
Note: Remove waste thread
if any.
Cleaning
0009-002 Chapter 3 1 19 AFU01EINP
6. Monthly Maintenance
7. Maintenance (Every 3 Months after Initial Month)
NM1: NEW MOLYNOC GREASE No. 1
Table 5A7
Maintenance Spots
Description
Grease
Cleaning
Check
Tools,
Name
DWG
Nozzles,
No. etc.
Table
Outer Circumference
5A22 Lubrication NM1 Brush and
Section of
-Axis Movable -1 Spatula
Bearing
Fig. 5A22-1 Table Section
0106-002 Chapter 3 1 19-1 AFU01EINP
Outer Circumference of -
Axis Movable Bearing
Lubrication
Apply grease with a brush or
a spatula.
7. Maintenance (Every 3 Months after Initial Month)
8. Half-Yearly Maintenance
DE1: DAPHNE EPONEX GREASE No. 1
Table 5A8
Maintenance Spots
Description
Grease
Cleaning
Check
Tools,
Name
DWG
Nozzles,
No.
etc.
Table Section X-Axis Ball Screw 5A23 Lubrication DE1 Brush,
Spatula
X-Axis Linear Guide 5A23 Lubrication DE1 Grease Gun,
-1 Brush
Z-Axis Ball Screw 5A24 Lubrication DE1 Brush,
Spatula
Z-Axis Guide 5A24 Lubrication DE1 Brush,
Bushing Spatula
-Axis Ball Screw 5A25 Lubrication DE1 Brush,
Spatula
-Axis Linear 5A25 Lubrication DE1 Grease Gun
Guide
Chuck Section Ball Screw for Chute 5A26 Lubrication DE1 Brush,
Width Adjustment Spatula
Linear Guide for 5A26 Lubrication DE1 Brush,
Chute Width Spatula
Adjustment
Backup Table Z-Axis 5A26 Lubrication DE1 Brush,
Guide Bushing Spatula
Backup Table Z-Axis 5A26 Lubrication DE1 Brush,
Ball Screw Spatula
Linear Guide for 5A27 Lubrication DE1 Brush,
P.C.B. Clamping Spatula
P.E.C. Recogni- P.C.B. Stopper 5A28 Lubrication DE1 Brush
tion Section Guide Bushing
X-Axis Linear Guide 5A28 Lubrication DE1 Brush,
Spatula
Y-Axis Ball Screw 5A29 Lubrication DE1 Brush,
Spatula
Y-Axis Linear Guide 5A29 Lubrication DE1 Brush
X-Axis Ball Screw 5A29 Lubrication DE1 Brush,
Spatula
8. Half-Yearly Maintenance
0106-003 Chapter 3 1 20 AFUQ01EINP