00191413-01.pdf - 第586页

17.4 Set-Up Generation User Manual Line Computer UNIX 17.4.2 Automatic Set-Up Generation Software Version 501.xx 01/99 Issue 17 - 54 17.4.2 Automatic Set-Up Genera tion Startin g Optimiza tion for lo t file Starti ng Pro…

100%1 / 621
User Manual Line Computer UNIX 17.4 Set-Up Generation
Software Version 501.xx 01/99 Issue 17.4.1 Lot Handlin
g
17 - 53
To open the optimization dialog, proceed as follows:
1. Click on the Optimization dialo
g
icon .
The optimization dialo
g
is opened.
To create a lot file, proceed as follows:
2. Activate the Create icon .
A window is opened.
3. Click on the editin
g
field and enter a name for the lot file
,
here:
Examples.lose
.
4. Click on the
OK
button.
Job Control is opened.
To edit a lot file, proceed as follows:
5. In Job Control activate the Create icon , then activate the Edit support
icon .
The Edit support Lot Data is opened.
6. Select the PCB
y
ou wish to edit b
y
double-clickin
g
, here:
Example_1.la
.
The PCB is transferred to the
Selection:
field.
7. Click on the
Abort
button, the other data are not used at this point.
Edit support is closed. The selected PCB is transferred to the editin
g
area.
8. In the editin
g
area click on the
Lot name
field and enter the lot name, here:
ex1
.
9. In the editin
g
area click on the
Lot size
field and enter the lot size, here:
10
.
10. In the editin
g
area click on the
Lot type
field and enter the lot t
y
pe, here:
F
.
11. Click on the
OK
button.
The
j
ob is transferred to the lot file. In the case of fault
y
entries, the respective field is surrounded b
y
a red
frame and an error messa
g
e is displa
y
ed above the list. Correct the entr
y
.
12. Insert the remainin
g
PCBs analo
g
ousl
y
, here:
Example_2.la
and
Example_3.la
, see chart.
To create the basic optimization data, proceed as follows:
13. Click on the
Basic Optimization Data...
command on the
SERVICES
menu.
The Basic optimization data window is opened.
14. Activate the Create icon and then activate the Edit support icon .
The Edit support Basic Optimization Data is opened.
15. Select the line,
here:
SMT.AK,
and the subline
,
here:
Linie.VA,
b
y
double-clickin
g
.
16. Click on the
Abort
button, no fixed or initial set-ups are used here. The edit support is closed.
The selected data are transferred to the editin
g
area.
17. Click on the
OK
button.
The data are transferred to the list.
18. Click on the
Quit
command on the
FILE
Menu.
A dialo
g
box containin
g
a re
q
uest for savin
g
data is opened
19. Click on the
Yes
button.
The Basic optimization data window is closed, the data are saved.
To save the lot file, proceed as follows:
20. Click on the
Save
command on the
FILE
menu.
The lot file is saved in the Job Data under the entered name.
21. Click on the
Quit
command on the
FILE
menu.
Job Control is closed. The Optimization Dialo
g
is opened.
PCB Lot name Lot size
Lot
type
Example_1.la ex1 10 F
Example_2.la ex2 13 F
Example_2.la ex3 16 F
17.4 Set-Up Generation User Manual Line Computer UNIX
17.4.2 Automatic Set-Up Generation Software Version 501.xx 01/99 Issue
17 - 54
17.4.2 Automatic Set-Up Generation
Starting Optimization
for lot file
Starting Producibility
check for lot file
Printing optimized
set-up
User Manual Line Computer UNIX 17.4 Set-Up Generation
Software Version 501.xx 01/99 Issue 17.4.2 Automatic Set-Up Generation
17 - 55
To start Optimization for a lot file, proceed as follows:
1. In the Optimization Dialo
g
activate the
Read in directory
icon .
The new lot file is listed.
2. Activate the Start icon .
3. Click on the
Examples.lose
lot file.
Optimization of the lot file is started. The Info Box indicates the pro
g
ress and the phases of the process,
as well as production time and the chan
g
eover time of the set-ups bein
g
calculated.
Upon the successful optimization, the status of the lot file is indicated as
optimized
. The set-up name
here:
Examples01.ar
is automaticall
y
assi
g
ned to the optimized set-up.
If errors are encountered durin
g
Optimization, the optimization run is aborted and the status of the lot file
is indicated as
faulty
. In the case of an error, proceed as follows:
Activate the Select icon .
Click on the fault
y
j
ob.
Click on the
View error file
option on the
SERVICES
menu.
The File displa
y
containin
g
the error file is opened.
Correct the errors displa
y
ed.
Click on the
Quit
option on the
FILE
menu.
File displa
y
is closed.
Optimization is re-started.
To check the producibility of a lot file:
4. Activate the Select icon .
5. Click on the
Examples.lose
lot file.
6. Click on the
Producibility check
option on the
SERVICES
menu.
The producibilit
y
check is started. Upon the successful check, the status of the
j
obs is indicated as
R (=ready)
.
To obtain a printout of the optimized set-up, proceed as follows:
7. Click on the
Examples.lose
lot file.
8. Click on one of the
j
obs of this lot file.
9. Click on the
Display set-up
option on the
SERVICES
menu.
The Set-Up Modification Generator is opened.
10. In the Set-Up Modification Generator activate the
Set-up modification instructions
button.
The set-up chan
g
eover instructions are displa
y
ed.
11. On the
FILE
menu click on the
Print
command, then
Print Line
.
The set-up is printed out for all stations.
12. Click on the
Quit
option on the
FILE
menu.
The Set-Up Modification Generator is closed.
13. After optimization has been successfull
y
completed, click on the
Quit
option on the
FILE
menu.
The Optimization Dialo
g
is closed.