FlexTRAK OH Material Handler Manual.pdf - 第53页
FlexTRAK-OH Material Handli ng System IOM Manual Installation © 2023 Nordson C orporation 3-3 3.5 Installing the Cables a nd Tubing Figure 3-3 Power Cable a nd Pneumatic Energ y Connection Point s 3.5.1 Connect ing the E…

FlexTRAK-OH Material Handling System IOM Manual Installation
3-2 © 2023 Nordson Corporation
3.4 Uncrating and Placing the FlexTRAK-OH
1. Safely dismantle the machine crate as instructed by the crate dismantling instructions.
2. Remove any screws that anchored the machine with the crate floors.
3. Identify the machine lifting point.
4. Place in the forklift fork under the machine profile as guarded by the lifting point label on
the machine (Figure 3-2).
Figure 3-2 Machine Lifting Point
5. Jack up the machine until the leveling foot pad gap with the floor is more than 10 cm.
6. Safely move the machine to the designated production place.
WARNING! Do not use the four castor wheels installed on machine bottom to move the entire
machine during relocation (Figure 2-14). This may cause machine damage when
the area is uneven or has an earthquake seismic risk.
7. Setup the machine orientation and clearance distance requirement as required by the
production plant. See 8.5 Clearance Distance Requirement.
8. Safely move down the forklift and place the machine in a safe area.
9. Remove all tie wraps from the machine components.
Cut the tie wrap carefully without damaging the machine cables, wires, tubing, etc.

FlexTRAK-OH Material Handling System IOM Manual Installation
© 2023 Nordson Corporation 3-3
3.5 Installing the Cables and Tubing
Figure 3-3 Power Cable and Pneumatic Energy Connection Points
3.5.1 Connecting the Electrical Power
To connect the electrical power:
1. Identify the electrical power cable supplied with the machine.
The electrical power cable is routed through the cable gland point.
The electrical power cable is installed with the machine electrical terminal block.
NOTE The socket for the electric receptable or power outlet connection is not supplied
with the machine.
WARNING! Only a certified electrician should perform the electrical wiring and socket
installation procedure.
2. Lockout the energy at the isolator switch and the plant electrical distribution panel (if
applicable). See 2.19.1 Electrical Power Lockout for details.
3. Prepare the factory electrical power outlet socket. Specifications for the supplied power
cable are as below:
• Cable wire list: Live (x1), Neutral (x1), Ground (x1)
• Cable length: 10 meters
• Cable size: 8 AWG, 10 mm
• Rated voltage: 220/240 V
• Ambient temperature: 60 °C
4. Safely plan the power cable route to the electrical power outlet.
5. Connect all cables to the appropriate electrical power socket.
6. Connect the machine electrical feeding cable socket to the power outlet (Figure 3-3).

FlexTRAK-OH Material Handling System IOM Manual Installation
3-4 © 2023 Nordson Corporation
3.5.2 Compressed Air and Vacuum Tube
1. Identify the connection points for compressed air and vacuum air (Figure 3-3).
2. Lockout the pneumatic energy at the shut-off valve and the plant pneumatic air distribution
panel (if applicable). See 2.19.2 Pneumatic Energy Lockout for details.
3. Plug in the applicable air tube to the specific connection point. Air tube fitting sizes are
listed as below:
• Vacuum air: 12 mm
• Compressed air: 10 mm
4. Safely route the tubes to the vacuum air and compressed air outlets. Ensure the tubes are not
tangled while routing the tubes.
5. Connect all tubes to the intended vacuum air and compressed air outlets.
3.6 Initial Setup Procedure/Pre-Teaching
The following initial set up procedure must be performed before running the production strips.
To perform the initial setup procedure:
1. Ensure the facilities energy output is within the range of machine operation specifications
(voltage and current) rating. The machine operating air pressure is 5.5 bar. The compressed
air pressure gauge and HMI input screen will self-power on.
2. Ensure light tower status light is solid yellow. See 2.16 Light Tower Status Lights.
3. Ensure the correct production recipe is selected.
4. Ensure the correct magazine dimensions are selected. See 1.7 Magazine Dimensions.
5. Ensure the following setup is correct:
a. Specification of strip lane conversion kit (Figure 3-4) must be equivalent to the
production recipe lane quantity (e.g., 5L or 6L) and magazine width. See
3.7.1 Conversion Kit Replacement for details.
Figure 3-4 Strip Lane Conversion Kit
b. The configuration value of magazine gripper scaling plate (Figure 3-5) must correspond
with the magazine length. See 3.7.2 Magazine Scale Plate Adjustment for details.