1OM-1064-002.pdf - 第126页

4. Thorough Procedures (from starting through ending operations including preparation).... Section 2 6.6 Interruption of Automatic Operation 6.6.1 How to Interrupt the Automatic Operation 6.6.2 Function of [SYS CLR] Butt…

100%1 / 244
4. Thorough Procedures (from starting through ending operations including preparation)....
Section 2 5.1 Preparation of Pattern Program
5.1.1 Preparation of Component Library
5.1.2 Creation of Pattern Program for Production Model
5.1.3 Registration (Storage in Memory) of Pattern Program
for Production Model
Section 2 5.2 Program Change Operation
5.2.1 Selection of Current Pattern Program (Program Change)
5.2.2 Adjustment of P.C.B. Positioning Section
5.2.3 Preparation of Nozzle Stocker Section
5.2.4 Preparation of Feeders
Tape Feeders
Vibratory Stick Feeders
Multi-Layer Tray Feeders (Option)
5.2.5 Feeder (B) Offset
Section 2 5.3 Pattern Program Checking for Production Model
5.3.1 Setting and Checking of P.C.B. Recognition
5.3.2 Confirmation of Placement Position
5.3.3 Confirmation of Components
Verification of Component Library Data
Confirmation of Pick-Up Position
5.3.4 Placement Verification
Section 2 5.4 Setting of Operation Mode
(1) Automatic Feeder Axis Adjustment Mode
(2) Overall Tact-Time Reduction
(3) Recognition Monitor Display Mode
(4) P.E.C. Manual Alignment Mode
4. Thorough Procedures (from starting through end-
ing operations including preparation) for Auto-
matic Operation (Component Placement)
4.1 Placement Mode
Follow the procedures (outline) below before actually producing P.C.B.’s.
Refer to “Items 5., 6., and 8. of Section 2” for details.
9910-001 2-27 Tg0246-PM-OP
4. Thorough Procedures (from starting through ending operations including preparation)....
Section 2 6.6 Interruption of Automatic Operation
6.6.1 How to Interrupt the Automatic Operation
6.6.2 Function of [SYS CLR] Button
Section 2 6.7 Emergency Stop
6.7.1 Cause and Symptom of Emergency Stop
6.7.2 Reset and Start Procedure from Emergency Stop
Section 2 6.8 Stop Operation
6.8.1 General Stop Procedure
6.8.2 Automatic Stop Procedure
6.8.3 Emergency Stop Procedure
Section 2 8. Shut-Down Operation (End of Production)
Section 2 6. Starting, Emergency Stop, and Temporary Stop (Pause) Operations
for Automatic Operation (“PLACE” Mode)
6.1 General Start Procedure
6.2 Temporary Stop Procedure
6.3 Start Procedure from “PAUSE” Mode
6.4 Component Supply during Automatic Operation
Tape Feeders
Vibratory Stick Feeders
Multi-Layer Tray Feeders (Option)
6.5 Operational Displays during Automatic Operation
9910-001 2-28 Tg0246-PM-OP
4. Thorough Procedures (from starting through ending operations including preparation)....
0004-002 2-29 Tg0246-PM-OP
4.2 PASS Mode
Follow the procedures (outline) below when P.C.B.’s should be transferred to
the output machine without being produced.
Refer to “Items 5. through of 8. Section 2” for details.
Section 2 5.1 Preparation of Pattern Program
5.1.2 Creation of Pattern Program for Production Model
5.1.3 Registration (Storage in Memory) of Pattern Program
for Production Model
Section 2 5.2 Program Change Operation
5.2.1 Selection of Current Pattern Program (Program Change)
5.2.2 Adjustment of P.C.B. Positioning Section
Section 2 7. Starting, Emergency Stop, and Temporary Stop (Pause)
Operations for Automatic Operation (“PASS” Mode)
7.2 Start Procedure
7.3 Stop Procedure
7.3.1 General Stop Procedure
7.3.2 Automatic Stop Procedure
7.3.3 Emergency Stop Procedure
Section 2 8. Shut-Down Operation (End of Production)