Transfer & Installation Procedure
5-9
Caution
For moving the position of the machine, you should first finish
PC on the machine and turn off the isolation switch. And then
pack it following the reverse order of installation
procedure(No.1No.9). When the machine is moved
completely, Repeat the installation procedure(No.1No.28).
Preparation for Production
6-1
Chapter 6. Preparation for Production
6.1. Preparation for the Component Supply Device
Prepare for devices that supply components during the process such as tape feeder,
stick feeder, multi-tray feeder, etc. for the production board.
Please refer to the manual of the corresponding component supply device for
guidance on installation.
6.2. ANC Preparation
A general 37-hole ANC is ed basic feature.
If possible, use of the system ANC as set on the system is recommended.
6.3. PCB Conveyor Part
Adjust the width of a conveyor. Preferably, the width of a conveyor should have the
margin of about 1mm each at the front and back when the board is inserted.
I
n case of holding the board in place by using a hole fixer, select the PCB fixing pin of
the hole fixer tat matches the size of the hole in the board. The size of the fixing hole
in the board is carved on the processing side of the pin.
Caution
If the conveyor width is set too wide, the board may not be
fixed tightly when it is fixed with the edge fixer. Take
precautions.
Memo