operation-cp45.pdf - 第273页
Utility Command 13-7 Caution To raise the level of placement precision, Warming UP m ust be done. To raise the level of placement precision, be sure to carry out warm up before operating the machine.

Samsung Component Placer CP-45F(V)/FS Operations Manual
13-6
Figure 13-8. “Warm-Up” dialog box
Figure 13-9. “Warm-Up” dialog box, After pressing the Start Button
<Start> button
Starts the warm up operation. When this button is clicked on, starts the warm-up
operation and the elapsed time is displayed in the “Warm-up” dialog box. When this
button is clicked on again, stops the warm up operation and closes the “Warm-up”
dialog box.
<Start> button
When this button is clicked on, stops the <Warm-up> operation.
<Close> button
Closes the dialog box.

Utility Command
13-7
Caution
To raise the level of placement precision, Warming UP must
be done.
To raise the level of placement precision, be sure to carry out
warm up before operating the machine.