CM602all_EJM8AESM_Service Manual.pdf - 第148页

Maintenance Adjustment Main Body Beam Remarks Remove the feeder cover and the chute. Phillips screwdriver #2 Allen key 3 mm Screw M4 2 pcs. Screw M4x10mm 3 pcs. Thick washer 3 pcs. Remove the fixed Z clamp plate. Allen k…

100%1 / 1093
Maintenance Adjustment Main Body Beam
Tools
Phillips screwdriver #2
Dial gauge
Iron plate
Allen key 3 mm
Magnetic stand
Jig
None
4-1-4      Parallelism of Board Transfer Conveyors
Be sure to remove the support pins beforehand.
This section describes the procedures for adjusting the board transfer conveyors to parallel.
Assembly
Adjustment
20min.
Teaching
min.
Total Time Weight of
Part
Removal
Disassembly
20min.
40min. kgs
Caution
Dange
r
Warning
EJM8A-E-SMA040104-A01-00
Page 4-1-4-1
Maintenance Adjustment Main Body Beam
Remarks
Remove the feeder cover and the chute.
Phillips screwdriver #2
Allen key 3 mm
Screw M4 2 pcs.
Screw M4x10mm 3 pcs.
Thick washer 3 pcs.
Remove the fixed Z clamp plate.
Allen key 3 mm
M4-10 8 pcs.
Place the iron plate on the head.
Iron plate
Allen key 3 mm
M4-15 1 pc.
Check the parallelism of the fixed clamp rail.
Specifications:
within ±0.02
Dial gauge
Magnetic stand
3
4
1
Item
2
EJM8A-E-SMA040104-A01-00
Page 4-1-4-2
Maintenance Adjustment Main Body Beam
Remarks
Item
Loosen the screws. Make the rail parallel.
Place the dial gauge at the end of the
reference plate.
Moving it along the plates, level them
with the bolts.
Allen key 3 mm
Specifications:
within ±0.02
Secure the tightness of the screws.
Confirm the parallelism. Specifications:
within ±0.02
Dial gauge
Magnetic stand
Put the fixed Z clamp plate back on.
Allen key 3 mm
M4-10 8 pcs.
Remove the iron plate from the head assembly.
Allen key 3 mm
M4-15 1 pc.
8
5
6
7
EJM8A-E-SMA040104-A01-00
Page 4-1-4-3