CM602all_EJM8AESM_Service Manual.pdf - 第557页
Refer to "Head Camera Adjustment --- Focus and Theta --." Machinery Part Replacement Head Camera Unit Section 4-1-2 Tools and Specifications Item Remarks 9 Switch on the main power. Tools and Specifications Adj…

Top vie
w
Tools and Specifications
Remove the LED lamp from the camera.
Take care with the orientation of the Fit the new LED lamp into the camera.
6
5
Machinery Part Replacement Head Camera Unit
Item Remarks
Tools and Specifications
connector.
Connect the connector.
Tools and Specifications
8
7
Tools and Specifications
Install the camera. Lightly tighten the screws so that the camera will not fall.
Camera connector
LED cable
Take care with the orientation of the
camera. (Check the connector
position.)
EJM8A-E-SMA050603-A01-00
Page 5-6-3-3

Refer to "Head Camera Adjustment
--- Focus and Theta --."
Machinery Part Replacement Head Camera Unit
Section 4-1-2
Tools and Specifications
Item Remarks
9
Switch on the main power.
Tools and Specifications
Adjust the camera.
Tools and Specifications
Phillips screwdriver #1
Phillips screwdriver #2
Screw M3 8 pcs.
M4 4 pcs.
10
11
Put B214the head cover back on.
EJM8A-E-SMA050603-A01-00
Page 5-6-3-4

Machinery Part Replacement
This section describes the procedures for replacing the line camera.
・Tools
Phillips screwdriver #2
Allen key 2.5 mm
Allen key 3 mm
Allen key 4 mm
Allen key 5 mm
Special short wrench 4
mm
Pipe
Wrench 5.5 mm
Nipper
・Jig
None
5-7-1 Line Camera Replacement
Line Camera Unit
Line Camera Unit
5-7
Caution
Dange
r
Warning
Assembly
Adjustment
50min.
Teaching
55min.
Total Time Weight of
Part
Removal
Disassembly
30min.
135min.
kgs
EJM8A-E-SMA050701-A01-00
Page 5-7-1-1