CM602all_EJM8AESM_Service Manual.pdf - 第603页

Machinery Part Replacement • This section describes the procedures for replacing the 12-nozzle head. Tool Phillips screwdriver #1 Phillips screwdriver #2 Allen key 5 mm Pipe Nippers Jig Cover (Large and Small) 12-Nozzle …

100%1 / 1093
Machinery Part Replacement
• This section describes the procedures for replacing the 12-nozzle head.
Tool
Phillips screwdriver #1
Phillips screwdriver #2
Allen key 5 mm
Pipe
Nippers
Jig
Cover (Large and Small)
12-Nozzle Head Unit
  5-10-1      12-Nozzle Head Replacement Procedures
12-Nozzle Head Unit
5
-1
0
Caution
Danger
Warning
Preparation: Remove all the nozzles and the nozzle holders from the head.
[Caustion before Replacement] * Magnets are installed. To ensure safety, use the magnet
covers when working on the machine.
* The head driver firm versions for the old and the new heads
should be the same. If they are different, trouble may occur.
EJM8A-E-SMA051001-A01-00
Page 5-10-1-1
Machinery Part Replacement
Remark
Turn off the power and the air supply.
Remove all the nozzles from the head.
Move the front and the rear beams towards
the front side.
Put the cover on the secondary part.
* Magnets are installed. To ensure safety,
use the covers when working on the
machine.
Cover (Large) Bolts x 4
Cover (Small) Bolts x 2
* Non-magnetic Allen
keys
Item
1
2
3
4
12-Nozzle Head Unit
1
2
(Large) Cover (Small)
Bolts
accompanying
the machine
R
ea
r
Front
EJM8A-E-SMA051001-A01-00