CP643 系统参考.pdf - 第161页

3. Command Descriptions For the most part, command explanations are presented in a one-page-per-command format, with the commands listed in their hierarchy order (from shallow to deep levels). Command pages can be displa…

100%1 / 388
Notes:
Part 3 Chapter 2 Command Index
Edition 1.0 3-2-4 CP643E System Reference
3. Command Descriptions
For the most part, command explanations are presented in a one-page-per-command format, with the
commands listed in their hierarchy order (from shallow to deep levels). Command pages can be
displayed at the machine to determine a command’s hierarchy level. The page format shown below is
used to explain the commands.
Command Title Command Page
Command Pass:
------------------------------------------------------------------------------------------------
(Explanation of the command.)
Edition 1.0 CP643E System Reference3-2-x
(Revision history of the command.)
Revision History
Vx.xx
CP643S3008
Part 3 Chapter 3 Command Descriptions
Part 3 Chapter 3 Command Descriptions
Edition 1.0 3-3-1 CP643E System Reference
AUTO 100-0-0
Command Pass: [AUTO]
The automatic production is performed.
Revision History
Cam Org Pos 120-0-0
Command Pass: [AUTO] - [Cam Org Pos]
Press to return cam axis to its origin position. While this key remains pressed the cam will move
toward its origin position. Movement stops when the cam returns to its origin. Movement also
stops if the key is released before the cam reaches its origin.
The message “Return Cam to Zero” displays in the second display area until the cam reaches its
origin. When the cam has returned the message “Press START” displays.
Revision History
MARK EDITOR 130-0-0
Command Pass: [AUTO] - [MARK EDITOR]
This command is used to edit the fiducial mark.
If there is not a fiducial sequence in the production program, this cannot be used.
Input the desired sequence number using the numeric keypad.
If the sequence number input has been entered the display goes to command page 130’.
Caution: This is a help command for irregular marks. If the mark sequence coordinates are obviously wrong
then revise the production program and then transmit the program again from the host computer.
Operators should also be aware beforehand that if this command is used the placing accuracy may
not fall within the accuracy range guaranteed by Fuji.
Revision History
Part 3 Chapter 3 Command Descriptions
Edition 1.0 3-3-2 CP643E System Reference