YV180X_Ope_E.pdf - 第197页
5 -121 EPD8013110 Operation Chapter 5 5 Creating the PCB data 10.2 Star ting the test mount Now , try producing only one PCB to check how components ar e mounted. W e recommend using a PCB with double-sided tape affix ed…

5
-120
EPD8013110
Operation
Chapter 5
5
Creating the PCB data
e
3. Press the emergency stop button, and set the PCB on the conveyor to
confirm that the width is correct. If not correct, quit automatic opera-
tion by executing the <1/1/E0 EXIT FROM RUNNING> command, then
select <1/2/PRD. DATA> - ”PCB Info.” to correct the “PCB Size” Y data.
4. After checking the conveyor width, adjust the locate pin and push-up
pin positions so that the PCB can be clamped on the conveyor. Finally,
remove the PCB.
Reference
Refer to “8. Changing the conveyor unit setup” in Chapter 4 for details on the conveyor
unit setups.
4 Set up the components (feeder set).
Run the <1/1/D4 ASSISTANT UTILITY> command, and select “COMPO-
NENT ASSIGNMENT” to check the setup of the components. A list of
feeder mounting positions appears as shown below.
COMPONENT ASSIGNMENT screen
27552-C0-00
No.
15
12
7
13
1
9
5
17
Feeder Type
8mmTape
8mmTape
8mmTape
8mmTape
8mmTape
8mmTape
8mmTape
8mmTape
Component Name
MINI_TR
MINI_TR
R2125
R3126
R1608
R1608
R2125
MINI_TR
SetNo.
F9
F10
F11
F12
F13
F14
F15
F16
Counter / Total
↑
↓
<<MODE>> 1/RUNNING
<COMMAND_LIST> D/INITIALIZE
D4 ASSISTANT UTILITY
ASSISTANT UTILITY
COMPONENT ASSIGNMENT
Reference
For details on the component setups, refer to the separate feeder user’s manual.

5
-121
EPD8013110
Operation
Chapter 5
5
Creating the PCB data
10.2 Starting the test mount
Now, try producing only one PCB to check how components are mounted.
We recommend using a PCB with double-sided tape affixed across the
mounting position.
1 Unplug the PREVIOUS INTERFACE connector
When the mounter is installed on a production line, unplug the GATE-IN
(PREVIOUS INTERFACE) connector on the lower right panel on the front of
the machine. If you perform a mounting test with this connector still
plugged, the PCB may flow into the downstream process after component
mounting, or the PCB may drop.
GATE-IN (PREVIOUS INTERFACE) connector
23553-D8-00
PREVIOUS
INTERFACE
2 Set the operation speed.
Press the [SPEED] key on the YPU, or select the <1/1/D6 RUNNING
UTILITY> - ”RUNNING SPEED” command, then set the speed to approx.
40 to 60%.
Speed setting box
27553-C0-00
Spead1 =
Spead2 =
Spead3 =
Spead4 =
Spead5 =
100
80
60
40
20

5
-122
EPD8013110
Operation
Chapter 5
5
Creating the PCB data
3 Start operation.
Check safety and then start PCB production as follows.
1. Place the PCB at the conveyor entrance so the entrance sensor
responds to the PCB.
Entrance sensor
23554-D8-00
Transfer
direction
Entrance sensor
PCB
2. Run the <1/1/A2 AUTO RUNNING> command or press the [RUN] key
to start operation.
3. Run the <1/1/D6 RUNNING UTILITY> - ”CONVEY OUT PCB”
command.
This command carries out the PCB without requesting the machine to
carry in the next PCB.
CONVEYOR OUT PCB command
27554-C0-00
<<<APPLICATION>>> 1/OPERATION/M
<<MODE>> 1/RUNNING
<COMMAND_LIST>
D/INITIALIZE
RUNNING UTILITY
CONVEY OUT PCB
Condition
PCB out
REfertence
For details on the CONVEYOR OUT PCB command, refer to “6. Finishing the PCB
production” in Chapter 4.
4 Proceed as follows if an error occurs.
If an error occurs during PCB data loading, component pickup or compo-
nent mounting, press the [Space] bar to temporarily stop the machine,
check the cause of the problem and take corrective action referring to the
next section, “10.3 Error countermeasures during mounting test”. To
resume operation after correcting the problem, press the [Space] bar again.
w
WARNING
NEVER ENTER ANY PART OF THE BODY IN THE AXIS MOVEMENT AREA OF
THE MOUNTER EVEN DURING TEMPORARY STOP. ALWAYS PRESS THE
EMERGENCY STOP BUTTON BEFORE ACCESSING A PART IN THE AXIS
MOVEMENT AREA.