Q170226E01.pdf - 第6页
SERVICE MANUAL RH5 3 DA3SEC−02−020−B0 5.10 Insertion Head T ransfer Chuck Claw/Rubber Replacement/Adjustment ...... 5.10−1 5.1 1 Insertion Head Center Position Check and Adjustment 5.1 1−1 .......... 5.12 Insertion Head …

RH5
SERVICE MANUAL
2
DA3SEC−02−020−B0
3. INSTALLATION 3.0−2.................................
3.1 Outline of Installation 3.1−1.........................................
3.1.1 Environmental Requirements 3.1−2...........................................
3.1.2 Transport 3.1−2............................................................
3.1.3 Installation 3.1−4...........................................................
3.1.4 Safeguards and Warning Lamps 3.1−5........................................
3.1.5 Connecting the Air Supply 3.1−6.............................................
3.2 Connecting the Power Supply 3.2−1.................................
3.2.1 Connecting the Cables 3.2−1................................................
3.2.2 Connecting Procedures 3.2−2...............................................
4. INSPECTION 4.0−2..................................
4.1 Inspection Check List 4.1−1........................................
4.1.1 XY Table 4.1−2............................................................
4.1.2 Loader/Unloader 4.1−3.....................................................
4.1.3 Insertion Head Unit 4.1−4...................................................
4.1.4 Insertion Drive Unit 4.1−5...................................................
4.1.5 Transfer Chuck 4.1−6.......................................................
4.1.6 Insertion Chuck 4.1−7......................................................
4.1.7 Tape Feed Unit 4.1−8.......................................................
4.1.8 Cutter 4.1−10...............................................................
4.1.9 Component Feeder 4.1−11...................................................
4.1.10 Anvil Unit (Top) 4.1−12......................................................
4.1.11 Anvil Unit (Bottom) 4.1−13...................................................
4.1.12 Cut Waste Bottle and Tape Waste Receptacle 4.1−14...........................
4.1.13 Exhaust Cleaner 4.1−15....................................................
4.1.14 MR Unit 4.1−16............................................................
4.1.15 Vacuum Pump 4.1−16......................................................
4.1.16 Main Controller 4.1−17......................................................
6. MAINTENANCE GUIDE
(MECHANICAL) 5.0−2.............................
1.1 XY Table Positioner and Guide Rail Check and Adjustment 5.1−1.......
5.2 X−Y Table Motor Replacement 5.2−1................................
5.3 X−Y Table Origin and Over Limit Check and Adjustment 5.3−1..........
5.4 Loader/Unloader Belt Replacement and Adjustment 5.4−1.............
5.5 Insertion Head Guide Parallelism Check and Adjustment 5.5−1.........
5.6 Insertion Head Guide Parallelism Check and Adjustment 5.6−1.........
5.7 Insertion Head Insertion Pusher Perpendicularity/Height Check/Adjustment . . .
5.7−1
5.8 Insertion Head Insertion Chuck 90G Swing Check and Adjustment 5.8−1.
5.9 Insertion Head Insertion Chuck 90G Swing Check and Adjustment 5.9−1.

SERVICE MANUAL
RH5
3
DA3SEC−02−020−B0
5.10 Insertion Head Transfer Chuck Claw/Rubber Replacement/Adjustment ......
5.10−1
5.11 Insertion Head Center Position Check and Adjustment 5.11−1..........
5.12 Insertion Head Chuck Opening/Closing Timing Check/Adjustment 5.12−1
5.13 Insertion Head Insertion Chuck Height Check and Adjustment 5.13−1....
5.14 Insertion Head Insertion Chuck Claws/Rubber Replacement/Adjustment .....
5.14−1
5.15 Lead Cutter and Tape Cutter Replacement and Adjustment 5.15−1......
5.16 Replacing Anvil Distortion Gauge 5.16−1.............................
5.17 Anvil Insertion Detection Amplifier Check 5.17−1......................
5.18 Anvil Cutter Blade Replacement and Adjustment 5.18−1...............
5.19 Anvil Parallelism Check and Adjustment 5.19−1.......................
5.20 Anvil Lower Clinch Stroke Check and Adjustment 5.20−1...............
5.21 Selector Unit Lead Guide Pin Replacement 5.21−1....................
5.22 Selector Unit Selector Rod Replacement 5.22−1......................
5.23 Selector Unit Guide Pin Parallelism Check and Adjustment 5.23−1......
5.24 Selector Unit Guide Pin Height Adjustment 5.24−1....................
Adjusting clearance 5.24−3..............................................
5.25 Feeder Carriage Origin Position Check and Adjustment 5.25−1.........
Origin position check 5.25−1............................................
Origin position adjustment (When deviation is 1.0 mm or less.) 5.25−1........
5.26 Feeder Unit Feed Pitch and Position Check and Adjustment 5.26−1.....
Feed pitch check 5.26−1................................................
Feeder carriage position adjustment 5.26−2...............................
Adjusting feed pitch (Cam feed adjustment) 5.26−2.........................
Adjusting feed (Cylinder feed) 5.26−3.....................................
Replacing/adjusting feed spring 5.26−4...................................
5.27 Feeder Component Sensor and Component Exhaust Sensor Settings .......
5.27−1
5.27.1 Part name 5.27−1..........................................................
5.27.2 Setting methods 5.27−1.....................................................
5.28 Main Drive Unit Timing Belt Replacement and Adjustment 5.28−1.......
Timing belt replacement 5.28−1..........................................
Adjusting belt tension 5.28−2............................................
5.29 Checking and Replacing Main Drive Unit and Top/Bottom Timing 5.29−1.
Timing check 5.29−1...................................................
Timing adjustment 5.29−1...............................................
Top and bottom timing check 5.29−2......................................
Top and bottom timing adjustment 5.29−2.................................
5.30 Anvil Height Check/Adjustment during Rising 5.30−1..................
Anvil height check during rising 5.30−1....................................

RH5
SERVICE MANUAL
4
DA3SEC−02−020−B0
When anvil too high: 5.30−2.............................................
When anvil position is low: 5.30−2........................................
5.31 Recognition Camera Lens Lamp Replacement and Adjustment 5.31−1...
Camera replacement 5.31−1............................................
Acrylic plate replacement 5.31−2.........................................
5.32 Setting Offset Values 5.32−1........................................
Preparations 5.32−1....................................................
Creating NC data 5.32−1................................................
Initial setting of individual machine data 5.32−3.............................
When using a customer’s board 5.32−3...................................
Camera installation 5.32−4..............................................
Camera position adjustment 5.32−5......................................
Automatic camera measuring
(X direction) 5.32−8.............................................................
Supplemental remarks 5.32−9...........................................
Automatic camera offset measuring (Y direction) 5.32−10.....................
Checking Recognition Operation 5.32−12..................................
5.33 Lead Cutter and Tape Cutter Stroke Adjustment 5.33−1................
Cam drive (Stroke adjustment of cutter 2) 5.33−2...........................
Cam drive (Cutting check) 5.33−2........................................
Cylinder drive adjustment 5.33−3........................................
Cylinder drive adjustment (If components are not cut properly:) 5.33−3........
5.34 Axis Height Check and Adjustment 5.34−1...........................
Tape waste check 5.34−1...............................................
Adjusting Z axis height (Raising the Z axis) 5.34−2.........................
Adjusting Z axis height (Lowering the Z axis) 5.34−3........................
5.35 Mechanical Valve Replacement and Adjustment 5.35−1................
Replacing mechanical valve 5.35−1......................................
Adjusting mechanical valve 5.35−1.......................................
5.36 Y Lock Cylinder Replacement and Adjustment 5.36−1.................
Replacing/adjusting Y lock cylinder 5.36−1................................
5.37 Using the Digital Sequence Timer 5.37−1............................
5.37.1 Preparation 5.37−1.........................................................
5.37.2 Procedure 5.37−2..........................................................
5.38 Backlight Replacement on Main Control Panel 5.38−1.................
Replacing backlight 5.38−1..............................................
6. MAINTENANCE PRECISION CHECK 6.0−2.............
7.1 Checking Maintenance Precision 6.1−1..............................
7. MAINTENANCE GUIDE
(CONTROL) 7.0−2.................................
7.1 NC Unit Adjustment 7.1−1..........................................
7.1.1 Table Signal Connection Check 7.1−1.........................................
7.1.2 AC Servomotor Drivers Adjustment 7.1−2.....................................