Q170226E01.pdf - 第91页

RH5 4.1 Inspection Check List SERVICE MANUAL 4.1−8 DA3SEC−80−020−B0 4.1.7 T ape Feed Unit [1] Rod end (2) Slide rod Spring Stopper bolt T ape Feed Unit Feed claw Parts cassette Guide Cut Waste Chute

100%1 / 392
4.1 Inspection Check List
SERVICE MANUAL
RH5
4.1−7
DA3SEC−80−020−B0
4.1.6 Insertion Chuck
(3) Rod
(4) Pin pivot 2
(4) Pin pivot 2
[2] Pin pivot 1
[1] Rack and pinion engagement
(4) Pin pivot 2
Insertion chuck
rubber
Inspection
Period Inspection item
x Make sure that the transfer chuck opens/closes smoothly.
Daily x Make sure that the transfer chuck rubber is not worn or damaged.
x Make sure to remove dust adhering on the surface. (tooth brush)
Oiling
Part
number
Oiling point Oil type
Oil
volume
Period Lubrication method
[1]
Rack and
pinion
engagement
Grease
Moder−
ate
amount
Weekly
x Remove all dirt adhering on the
surface completely and apply a
thin
coat
of
grease
[2] Pin pivot 1
amoun
t
t
hi
n coat o
f
grease.
(3) Rod
Machine 1−2
Monthly
x
App
l
y
1or2dro
p
s to rod and
p
in
(4) Pin pivot 2
Machine
oil
12
drops
2 weeks
Apply
1
or
2
drops
to
rod
and
pin
pivot 2.
RH5
4.1 Inspection Check List
SERVICE MANUAL
4.1−8
DA3SEC−80−020−B0
4.1.7 Tape Feed Unit
[1] Rod end
(2) Slide rod
Spring
Stopper bolt
Tape Feed Unit
Feed claw
Parts cassette
Guide
Cut Waste Chute
4.1 Inspection Check List
SERVICE MANUAL
RH5
4.1−9
DA3SEC−80−020−B0
Inspection
Period Inspection item
Daily
x Make sure that slide rod feeds component smoothly.
D
a
il
y
x Make sure that slide rod top spring is secured completely.
Monthly
x Check the feed claw of the parts cassette and remove any cut waste of the
base tape.
Daily
x Make sure that cut waste chute guide is not bent.
Oiling
Part
number
Oiling point Oil type
Oil
volume
Period Lubrication method
[1] Rod end Grease
Moder−
ate
amount
Monthly
x Remove all dirt adhering on the
surface completely and apply a
thin coat of grease.
(2) Slide rod
Machine
oil
1−2
drops
2 weeks
x Apply 1 or 2 drops to slide rod.