Q170226E01.pdf - 第78页

3.1 Outline of Installation SERVICE MANUAL RH5 3.1−5 DA3SEC−1 1−010−A0 3.1.4 Safeguards and W arning Lamps Be sure to install the safeguards and warning lamps. =REFERENCE= Refer to ’SAFETY’ for safety interlock arrangeme…

100%1 / 392
RH5
3.1 Outline of Installation
SERVICE MANUAL
3.1−4
DA3SEC−11−010−A0
3.1.3 Installation
Install the machine even with the ground by using a spirit level.
=CHECK=
If the machine has not been installed level with the ground, the expected functions cannot be
attained.
Install the machine on the location where the following conditions can be met:
x The humidity is in the range of 20−90% with no dew formation.
x No considerable vibration
x Free from dust and/or soot
x Capable of sustaining the mass of the machine
x No influence of electric nozzle is received.
x No inflammable or corrosive gas is around.
Spirit level
3.1 Outline of Installation
SERVICE MANUAL
RH5
3.1−5
DA3SEC−11−010−A0
3.1.4 Safeguards and Warning Lamps
Be sure to install the safeguards and warning lamps.
=REFERENCE=
Refer to ’SAFETY’ for safety interlock arrangement.
Safeguard
Warning lamp
(NM−8244A,B,C)
(NM−8245A,B,C)
3,296 (NM−8244A, NM−8245A)
4,146 (NM−8244B, NM−8245B)
5,160 (NM−8244C, NM−8245C)
1,860 (NM−8244A,B,C)
2,025 (NM−8245A,B,C)
3,296 (NM−8244A, NM−8245A)
4,146 (NM−8244B, NM−8245B)
5,160 (NM−8244C, NM−8245C)
(NM−8244A,B,C)
(NM−8245A,B,C)
660
797
1,200: M
1,228: LL
1,650 (NM−8244A,B,C)
1,600 (NM−8245A,B,C)
1,950 (NM−8244A,B,C)
1,900 (NM−8245A,B,C)
RH5
3.1 Outline of Installation
SERVICE MANUAL
3.1−6
DA3SEC−11−010−A0
3.1.5 Connecting the Air Supply
Connect the primary air piping to the machine.
Make sure that the primary air pressure is more than 0.5 MPa and flowrate more
than 120 L/min (A.N.R).
=CHECK=
The primary air shall have no foreign substances such as moisture.
After completing the piping connection, supply the primary air, and adjust it to 0.5 MPa
using the MR unit.
Primary side air piping
connection