Hanwha SM481 PLUS Series Administrator’s Guide Eng.pdf.pdf - 第520页

18-4 Fast Flexible Placer SM481(L) PLUS Administ r ator’s Guide  <- Pla ce T ime> Indicates the time of installation from turning on the po we r of the equipment to the present time.  <- T r ansfer Time> In…

100%1 / 566
18-3
Production Information Management
Board/Hour
Indicates the number of parts that are expected to be placed in an hour based
on the Peak Build Cycle (sec/board).
<Mean Build Cycle>
sec/board
The average required time that was taken to work on one PCB is displayed in
the second unit. [Peak Build Cycle Time (sec/board) ].
CPH
Indicates number of parts placed in an hour after the initial PCB is fed to the
work station.
Board/Hour
Indicates number of PCBs produced in an hour after the initial PCB is fer to
the work station.
<Previous Cycle>
Previous Cycle Time =Build Time +Transfer Time
sec/board
Indicates the required time in the “second” unit until the next PCB is fed since
the most recently produced PCB was fed to the work station. [Previous Cycle
Time (sec/board) ]
CPH
Indicates the number of PCBs that are expected to be produced in an hour
based on the Previous Cycle Time (sec/board).
Board/Hour
Indicates the number of parts that are expected to be placed in an hour based
on the Previous Cycle Time (sec/board).
<- Build Time>
Indicates the required time in the “second” unit from the time the backup table
moves up after the most recently produced PCB was fed to the work station to the
time the backup table moves down after the PCB is placed.
<- Transfer Time>
Indicates the required transportation time per PCB.
<Operation Status> group
Display the information for operating time.
<Run Time>
Indicates the total time of placement time and wait time. (Run =Place +Wait)
(Run =Place +Transfer +Wait)
18-4
Fast Flexible Placer SM481(L) PLUS Administrator’s Guide
<- Place Time>
Indicates the time of installation from turning on the power of the equipment
to the present time.
<- Transfer Time>
Indicates the total time of PCB transportation from turning on the power of the
equipment to the present time.
<- Entry Wait>
Indicates the total time the PCB waits until the current time for placement
after the machine is turned on.
<- Exit Wait>
Indicates the total time that the PCBs have been worked completely waits
until the current time for transfer to the next machine after the machine is
turned on.
<Stop Time> group
Indicates the time equipment was in stop status from turning on the power of the
equipment to the present.
<Run Stop Count>
Indicates the machine stop count during automatic production.
<Stop>
Indicates the machine stop count performed by the user during automatic
production.
<Error Stop>
Indicates the count of machine stop performed by an error during automatic
production.
<Reset> button
Initializes all the indication information.
<Print To File> button
Saves the placement information related with PCB production in the assigned folder
(C:\ SmartSM\Pdinfo) in text file(*.txt) format.
18-5
Production Information Management
<PPM<->%> button
Converts the indicated unit. (PPM<->%)
<Close> button
Closes the screen.