Hanwha SM481 PLUS Series Administrator’s Guide Eng.pdf.pdf - 第533页
19-7 PM Manager Figure19.6 I nquiry of Action s Taken During Checking from History Screen 19.4.6. Changing All Check Items to Check Completed Status (“OK”) All check i tems c an be cha n ged to the check c ompleted st at…

19-6
Fast Flexible Placer SM481(L) PLUS Administrator’s Guide
19.4.5. Recording Check Results
Record and store the check results in the “PM Check”. This can be performed in the
following manner.
Click <Check> button.
Execute ‘PM Check’ Dialog Box
Figure19.5 ‘PM Check’ Dialog Box of PM Manager
Record the measures taken during check (action, result and note) and click the <OK>
button.
For the items for which actions were taken in the <PM Check> group, the <Status>
column is changed from “Check” to “OK” and the date is updated to the PM Check
date in the <Next PM> column as shown below.
The recorded actions can be checked from the History Screen.

19-7
PM Manager
Figure19.6 Inquiry of Actions Taken During Checking from History Screen
19.4.6. Changing All Check Items to Check Completed Status (“OK”)
All check items can be changed to the check completed status simultaneously. This can be
performed in the following manner.
Click the <Reset All Items> button
When the PM Manager dialog box appears, click the <Yes> button.
Once set as above, all check items in the Main Screen are changed to the check completed
status (“OK”), and the number of items to be inspected are indicated as “0”.

19-8
Fast Flexible Placer SM481(L) PLUS Administrator’s Guide
Figure19.7 Main Screen of PM Manager
The history of all changed items are recorded in the History Screen, and “Reset all items”
is indicated in the ‘Note’ column.
19.4.7. Outputting Check Items in File Format
All check items can be outputted in text file format. This can be performed in the
following manner.
Click the <Print to File> button
Enter the file name and designate the file path and then click <Save>.