Operating Instructions_VF335_en.pdf - 第117页
5|Commissioning 5.7 Backing up all data on the machine NOTE Regularly back up data! – After commissioning, first back up data! – Back up data on a quarterly basis! – If the control PC is faulty, your data may be unusab…

5|Commissioning
e) Wait until the switch-off delays have expired.
a) Turn the main switch to the OFF position and secure it with a safety lock!
Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 116/695

5|Commissioning
5.7 Backing up all data on the machine
NOTE
Regularly back up data!
– After commissioning, first back up data!
– Back up data on a quarterly basis!
– If the control PC is faulty, your data may be unusable. Back up data on an ex-
ternal disk once a year! Data is stored in the [Data storage] folder. With respect
to this, please read chapter [File path]!
– Document each data backup and store it in a safe place!
ü To perform the data storage of all messages, process data and soldering pro-
grams:
a) Always use an external archive device for data storage.
b) In addition, check the list of users for accuracy and completeness. Check the
permissions of all users and reassign them if necessary.
ð The process has now been completed.
Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 117/695

5|Commissioning
Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 118/695