Operating Instructions_VF335_en.pdf - 第90页
4|Transport, installation, storage, disposal Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 90/695

4|Transport, installation, storage, disposal
Waste prevention has priority over waste disposal!
Many parts of the machine can be used again. Only when reuse is not possible,
should these parts be recycled.
The machine can contain the following substances or devices:
Electronic and electrical equipment Computer, frequency converters, elec-
tronic controllers, contactors, relays,
monitors, cameras, sensors, measuring
instruments, motors, cooling units,
fluorescent lamps, preheater modules
Batteries Undervoltage supply unit, buffer batter-
ies
Plastics Cables and energy chains, hoses, heat in-
sulation, protective screens, sensors
Metals Steel, copper, aluminum, brass, gold,
lead, tin, silver
Glass Preheater modules, cover panels
Lubricants Automatic chain oiler
Solders Pot, automatic solder feeding
Flux materials, condensates, refrigerants Flux material tanks, condensate tanks,
cooling units
NOTE
Disposal of electrical equipment
Waste Disposal in accordance with Directive 2002/96/EC of the European Parliament
and of the Council of 27 January 2003 on waste electrical and electronic equipment:
Products marked with the symbol of a crossed out wheeled bin must not be disposed
of with unsorted municipal waste. Local authorities have set up special collection
points for their disposal. Please check with your city or district council authorities the
options available for the separate collection of used equipment. This way, you can
make your contribution to the reuse or other forms of use of waste to protect the en-
vironment and human health.
Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 89/695

4|Transport, installation, storage, disposal
Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 90/695

5|Commissioning
5 Commissioning
5.1 Read this first!................................................................................................................................................. 92
5.1.1 Target readers group ........................................................................................................................93
5.1.2 For your safety..................................................................................................................................93
5.1.3 Supplementary documents ..............................................................................................................93
5.2 Machine operating modes .............................................................................................................................. 94
5.3 First commissioning ........................................................................................................................................ 96
5.3.1 Connecting the machine...................................................................................................................96
5.3.2 Adjust pneumatic and nitrogen pressure .........................................................................................96
5.3.3 Set the language ...............................................................................................................................97
5.3.4 Logging in a user ...............................................................................................................................97
5.3.5 Checking the EMERGENCY STOP function ........................................................................................97
5.3.6 Setting time and date .......................................................................................................................98
5.3.7 Indicator lamp: Perform light test ....................................................................................................99
5.3.8 Checking the safety equipment........................................................................................................99
5.3.9 Referencing modules......................................................................................................................100
5.3.9.1 Referencing the fluxer module .....................................................................................101
5.3.9.2 Referencing the soldering module ...............................................................................102
5.3.9.3 Referencing width adjustment .....................................................................................102
5.3.10 Check modules................................................................................................................................104
5.3.10.1 Check the conveyor system..........................................................................................104
5.3.10.2 Checking width adjustment..........................................................................................105
5.3.10.3 Check fluxer module.....................................................................................................105
5.3.10.4 Checking preheater modules........................................................................................105
5.3.10.5 Check the compressed air heater (optional) ................................................................106
5.3.10.6 Checking the solder temperature.................................................................................106
5.3.10.7 Enabling the nitrogen supply........................................................................................106
5.3.10.8 Check stoppers and board fixation...............................................................................107
5.4 Preparing the machine for operation ........................................................................................................... 109
5.5 Recurring commissioning.............................................................................................................................. 110
5.5.1 Activation via weekly timer ............................................................................................................110
5.6 Machine deactivation ................................................................................................................................... 111
5.6.1 Switch off the machine using the weekly timer .............................................................................111
5.6.2 Leaving the [Automatic] operating mode.......................................................................................112
5.6.3 Automatic switch-off in case of power failure (with UPS)..............................................................114
5.6.3.1 If no board is present inside the machine ....................................................................114
5.6.3.2 If some boards are still inside the machine ..................................................................114
5.6.3.3 Automatic switch-on when power is restored (with UPS)............................................114
5.6.4 Manual shutdown for a longer period of time ...............................................................................115
5.7 Backing up all data on the machine .............................................................................................................. 117
Ersa GmbH Operating Instructions_VF335_en|Rev. 14|30/11/2017 91/695