DECAN_F2_Service(Eng_Ver1).pdf - 第103页

5-3 Head 5.2. Ball Spline 5.2.1. Required Tools  T wrench (other tools supplied) or hex wrench  Gear wrench or torque wrenc h 5.2.2. Position of Ball Screw 5.2.3. Ball Spline Re placement Procedure 1) Manipulat e the t…

100%1 / 604
5-2
Fast & Flexible Chip Shooter DECAN F2 Service Manual
8) Assemble the head module in the reverse order of disassembling. However, assemble
it paying attention to the following.
9) Once the assembling is completed, turn on the main switch on the front of the machine
and boot the PC.
10) Perform the following calibrations.
Full Calibration
Total Time : 2Hour
5-3
Head
5.2. Ball Spline
5.2.1. Required Tools
T wrench (other tools supplied) or hex wrench
Gear wrench or torque wrench
5.2.2. Position of Ball Screw
5.2.3. Ball Spline Replacement Procedure
1) Manipulate the teaching box to move the head module to the front.
2) Close the PC as usual and turn off the main switch at the front of the machine.
3) Cut off the main pneumatic air supply.
4) Remove the pneumatic tube connected to the head module.
5) Unscrew the fixing bolts securing the Air Module and remove it.
5-4
Fast & Flexible Chip Shooter DECAN F2 Service Manual
6) Move the spindle to be removed down.
7) Unscrew the fixing bolts securing the Z sensor dog using a hex wrench and remove it.