DECAN_F2_Service(Eng_Ver1).pdf - 第386页
15-12 Fast & Flexible Chip Shooter DECAN F2 Service Manual 3) Assemble the Safeguard Override Key to the panel using a switc h assembling jig.

15-11
Electric Device
15.5. Front Power Panel
15.5.1. Required Tools
Crosshead (Phillips) screwdriver and flathead screwdriver
T Wrench or Hex Wrench
15.5.2. Part list of Front Power Panel
15.5.3. Front Power Panel Full assembly method
Warning If the main circuit breaker located at the lower left on the
rear side of the machine is not turned off before performing
service, serious injury may occur. Perform servicing with the
power supply to the motor cut off without fail.
1) Assemble the main switch to the panel.
2) Insert the Safeguard Override Key to the panel.
No Part No. Part Name Unit
Quantity
1 J3406005A LOAD SWITCH PI-25 1
2 FC09-003401A BRACKET-FRONT ELEC
PANEL
1
3 AM03-01079A SAFEGUARD_OV_SW_KE
Y_CABLE_ASSY
SM411-
SC008
1
4 AM03-010917A CABLE ASSY-
MAIN_SWITCH_TRANS
SM511_PW
005
1

15-12
Fast & Flexible Chip Shooter DECAN F2 Service Manual
3) Assemble the Safeguard Override Key to the panel using a switch assembling jig.

15-13
Electric Device
4) After connecting the connector as shown in the following figure, arrange the cables
using cable ties.