DECAN_F2_Service(Eng_Ver1).pdf - 第308页

13-38 Fast & Flexible Chip Shooter DECAN F2 Service Manual  V iewing Daily Check Items If the <Daily> option button from the <Period Search Condit ion> group is clicked, daily check items can be checked.…

100%1 / 604
13-37
Software
13.2.3. Main Screen configuration
1) Today’s Check Item View
For the items to be inspected today, the <Check> button is indicated in red in the
<Status> column.
For the items that do not need to be inspected today, the <OK> button is indicated in
black in the <Status> column.
The number of items to be inspected today is indicated on the “Remains”.
2) In the main screen, the check items of the machine can be checked by check periods
(daily, weekly and monthly).
Viewing Check Items by Check Period
Viewing All Daily, Weekly and Monthly Check Items If the <Total> option button
from the <Period Search Condition> group is clicked, all daily, weekly and
monthly check items can be checked.
13-38
Fast & Flexible Chip Shooter DECAN F2 Service Manual
Viewing Daily Check Items
If the <Daily> option button from the <Period Search Condition> group is clicked,
daily check items can be checked.
Viewing Weekly Check Items
If the <Weekly> option button from the <Period Search Condition> group is
clicked, weekly check items can be checked.
Viewing Monthly Check Items
If the <Monthly> option button from the <Period Search Condition> group is
clicked, monthly check items can be checked.
3) Viewing Only Items in Use
After the check items are registered, setup can be performed so that they are not to be
used.
If the <Use only> option button from the <Period Search Condition> group is clicked,
only the check items in use can be checked.
4) Updating Screens
13-39
Software
If the contents of the DB are different from those displayed in the main screen, press
the <Update> button to update the screen output.
5) Recording Check Results
Record and store the check results in the “PM Check”. This can be performed in the
following manner.
Click <Check> button
Execute ‘PM Check’ Dialog Box
Record the measures taken during check (action, result and note) and click the <OK>
button.
For the items for which actions were taken in the <PM Check> group, the
<Status> column is changed from “Check” to “OK” and the date is updated to the
PM Check date in the <Next PM> column as shown below.
The recorded actions can be checked from the History Screen.