DECAN_F2_Service(Eng_Ver1).pdf - 第181页

ANC

100%1 / 604
6-30
Fast & Flexible Chip Shooter DECAN F2 Service Manual
4) Connect the belt to the Idler and assemble the Guide Shuttle Extension PCB.
5) Assemble the opposite Conveyor Frame in the same manner as steps #1~#4.
6) Assemble the shuttle of the Exit Zone in the same manner.
ANC