DECAN_F2_Service(Eng_Ver1).pdf - 第313页
13-43 Software 2) Setting Check Period as Default When setting the changed check period as de fault value again, click the <Default> button for the correspondi ng item. The change check period is set as default a…

13-42
Fast & Flexible Chip Shooter DECAN F2 Service Manual
The text file is saved in the form shown below.
13.2.4. Setup Screen
1) Changing Check Period
The check period of each check item can be changed in the setup screen.
Click the combo box button in the Time Unit column for the items whose check
period is to be changed as shown in the following figure to change the check
period (daily, weekly and monthly).

13-43
Software
2) Setting Check Period as Default
When setting the changed check period as default value again, click the <Default>
button for the corresponding item.
The change check period is set as default again.
3) Setting Whether to Use Check Period
Set whether to use the check item in the <Use> column.
4) Adding User Check Item
User can add a new check item. This can be performed in the following manner.
Click the <Add Item…> button and execute the ‘Add PM Item’ dialog box.
Enter an item to be added in the ‘Add PM Item’ dialog box and set the check period.

13-44
Fast & Flexible Chip Shooter DECAN F2 Service Manual
If the user check item is added by clicking the <OK> button, a new check item is
added in the setup screen.
5) Modifying User Check Items
The registered user check items can be modified. This can be performed in the
following manner.
Click the <Modify Item…> button.
Modify the registered check item.