DECAN_F2_Service(Eng_Ver1).pdf - 第161页

6-11 Conveyor Ref Assemble the belt referring to the following.  T ension: 22 ±2.5 Hz  T ension Measurement location: Move tension Bracket up and down to adjust the tension. 6.2.7. PCB Power trans mission Belt Repl ace…

100%1 / 604
6-10
Fast & Flexible Chip Shooter DECAN F2 Service Manual
4) Replace the belt with a new one.
Ref The part number of the new belt is J66021005A.
5) Assembled the reverse order of disassembling.
6-11
Conveyor
Ref Assemble the belt referring to the following.
Tension: 22 ±2.5 Hz
Tension Measurement location:
Move tension Bracket up and down to adjust the tension.
6.2.7. PCB Power transmission Belt Replacement Procedure
1) Remove the Belt based on the "Work Zone PCB transfer Belt replacement procedure"
2) After loosening Tension Loosen slightly the bolts that secure the Motor, and remove
the Belt.
6-12
Fast & Flexible Chip Shooter DECAN F2 Service Manual
3) Replace the belt with a new one.
Ref The Part number of to replace the Belt J66021007A.
4) During assembly, please assemble it in mind the next.