DECAN_F2_Service(Eng_Ver1).pdf - 第241页

11-11 Vacuum  Arrange the cables a s follows . For the g rounding cable , insert it through the center of the washers (2 sets) an d perform screw connection.  Assemble the cover of the distribution unit. Description Re…

100%1 / 604
11-10
Fast & Flexible Chip Shooter DECAN F2 Service Manual
Remove the cover of the distribution unit.
Check the U, V and W phases. (Exercise care to ensure that the U and W phase are
not changed.)
11-11
Vacuum
Arrange the cables as follows. For the grounding cable, insert it through the center
of the washers (2 sets) and perform screw connection.
Assemble the cover of the distribution unit.
Description Regulation
10
11-12
Fast & Flexible Chip Shooter DECAN F2 Service Manual
After installing the base frame and lifting the cushion pump on the base frame,
assemble the cushion air pump by determining its position with a hole guide.
Remove the tube nylon from the base frame hole.