DECAN_F2_Service(Eng_Ver1).pdf - 第175页
6-25 Conveyor 4) Move the sensor and stopper of the Entry Zone to the Exit Zone. 5) Move the sensor and stopper of the Exit Zone to the Entry Zone

6-24
Fast & Flexible Chip Shooter DECAN F2 Service Manual
3) Move the sensor of the Entry Zone to the Exit Zone.

6-25
Conveyor
4) Move the sensor and stopper of the Entry Zone to the Exit Zone.
5) Move the sensor and stopper of the Exit Zone to the Entry Zone

6-26
Fast & Flexible Chip Shooter DECAN F2 Service Manual
6.5. Replacement location of Shuttle
6.5.1. Required Tools
T-Wrench (other tools supplied) or Hex Wrench
6.5.2. Procedure for replacing the Dual Conveyor to the Full Dual Conveyor
1) Unscrew the fixing bolts securing Entry Zone Shuttle and Exit Zone Shuttle and
remove them.
2) Unscrew the fixing bolts securing Entry Zone Shuttle, Exit Zone Shuttle and
Cableveyor and remove them.
3) Unscrew the fixing bolts securing Cover remove it.