3-13 Installation & Operation 415V Caution If the input voltage of t he transformer was changed, the power sticker attached on the machine must be changed according to the changed voltage. Mark the power supply on th…

3-12
Fast & Flexible Chip Shooter DECAN F2 Service Manual
240V
380V

3-13
Installation & Operation
415V
Caution If the input voltage of the transformer was changed, the
power sticker attached on the machine must be changed
according to the changed voltage. Mark the power supply
on the S/N nameplate in oil magic ink. Otherwise, the
machine may be damaged due to the input of incorrect
power supply.
Warning If there is no voltage value for the local power supply on the
transformer input terminal, perform setting to the input port
with the voltage value one step higher.
6) Turn on the main pwer supply switch.

3-14
Fast & Flexible Chip Shooter DECAN F2 Service Manual
7) After checking the power supply setup, assemble the cover in the reverse order of
disassembling.
Ref Power Consumption: 5.0 KVA
Grounding: Based on the Class 3 grounding, it must be less than
100 when performing a Mega test with the machine for the
grounding line.
Caution When single phase current is taken off from the 3 phase
current, it is desirable to use 40% of the total capacity (kW)
as single phase current in order to prevent the machine
from being damaged due to distortion caused by the trip.
(Ex: When using a tray feeder)
3.1.6. Pneumatic Pressure Setup and Cable Connection
1) Unscrew the fixing bolts securing the cover at the rear bottom right of the machine and
remove it.