RS-1_instruction manual.pdf - 第213页
Part 1 B asic O peration Chapter 2 Pr oduction 2- 102 Nozzle Setup Assistant This button displays the noz zle assi gnment spe cified with a pro duction progra m and the a ctual assignme nt on the AT C . If there is any d…

Part 1 Basic Operation Chapter 2 Production
2-101
Feeders automatically
taught are excluded.
Prohibits feeders that were automatically taught successfully once from being
taught again automatically.
(5) Tape cueing
Set component cueing (heading) to track a component pick-up position.
Tape cueing Description
Execute cueing Cues a component.
The cued feeder is
excluded.
Prohibits a component from being cued at a feeder whose component has
been cued already.
Pick Trace
This button starts up the screen for tracking a component pick-up position.
Only feeders specified with the menu item “Tracking order” on the “Pick position tracking” screen
are to be traced.
See Section 4.5.6.4 “Place” and Section 4.5.6.5 “Pick position/Pick height” of Chapter 4 “Creating a
Production Program” for details.
- Pick Trace

Part 1 Basic Operation Chapter 2 Production
2-102
Nozzle Setup Assistant
This button displays the nozzle assignment specified with a production program and the actual
assignment on the ATC.
If there is any difference between these assignments, it is displayed in red on the screen.
(1) Menu items displayed in the table
Item
Description
Nozzles used in the
production program
Displays nozzles used with a production program.
Nozzles on ATC Displays nozzles assigned to the ATC.
The nozzle number, the bank from which components are picked up, and the state of the
nozzle are shown in the table “Nozzles used in the production program.”
Nozzle
7504
Pick F/R
Status OK
(2) Nozzles used in the production program
Item Description
Nozzle Displays the nozzle number used with a production program.
Pick
Feeder bank from which components are picked up
F, R
Status
Displays the nozzle number used with a production program and the status of
the nozzle number on the ATC.
OK: Normal status
ERR: If a nozzle assignment of a production program is not consistent with the
actual assignment to the ATC

Part 1 Basic Operation Chapter 2 Production
2-103
When you press the <Assign nozzles> button, you can assign nozzles to the ATC.
See Section 8.3.2.3 “ATC nozzle setup” of the Chapter 8 “Machine Setup” for details.