RS-1_instruction manual.pdf - 第469页
Part 1 B asic O peration Chapter 4 Cr eating a Produc tion Progra m 4- 134 (4) Model option 1) Consider the com ponent t ypes and height s When you ch eck this check box, t he system speci fies the com ponent l ayer wi t…

Part 1 Basic Operation Chapter 4 Creating a Production Program
4-133
All feeders can be arranged on only one side giving priority to the side. In case all the
number of feeders to be used cannot be put in the bank of one side, the other side also can
be used.
(3) "Placement order" option
Specify the placement data order: use the input order or change it according to the optimized
result.
Data order
a) Assign in input order of production program File
Placement data will be displayed in entry order (that is, not changed at all).
b) Assign in optimized order
Placement data will be displayed in the optimized order.
You can display the optimized order of placement order by selecting the [Optimization]
― [Divided placement data] commands from the menu also. (You cannot edit any data
on this screen.)
CAUTION
"Assign in optimized order" is a function for editing the optimized data
(optimization result can be referred to, but cannot be edited).
However, once this function is executed, the data in order of the
original date entry will be deleted. Therefore, back up the data before
executing this function.

Part 1 Basic Operation Chapter 4 Creating a Production Program
4-134
(4) Model option
1) Consider the component types and heights
When you check this check box, the system specifies the component layer with considering
the component height automatically to create a program that places components in high
density (that is, places components adjacently).
When you check this check box actually, the system places components in the following
order:
<Component placement by considering the component type and component height>
Placement order ① Placement order ② Placement order ③
<Relation between the component placement priority and the component type and height>
As indicated with “Priority” in the table below, components other than aluminum electrolytic
capacitor is prioritized.
Priority Component type Component height (mm)
1 Square chip resistor
0 < t ≦ 0.25
2
Square chip resistor
Components other than Elec.
Cap. (aluminum electrolytic
capacitor)
0
<
t
≦
5.5
3
5.5
<
t
≦
12.0
4
12.0 < t
5
Elec. Cap. (aluminum
electrolytic capacitor)
0
<
t
≦
5.5
6
5.5
<
t
≦
12.0
7
12.0
<
t

Part 1 Basic Operation Chapter 4 Creating a Production Program
4-135
<Priority of layers>
The relation between layers is shown in the table below.
Priority Layer type
1 Placement layer
2 Component layer
3 Component type/height layer
If the system is not able to place a component on a board because components run out
during PWB production when the option “When components run out, production pauses” is
not selected on the “Production (Pause)” tab invoked from the “Operation option” screen, the
system skips the corresponding placement to continue the current PWB production. The
system places the skipped component finally after the production resumes by your
replenishing the feeder that caused a component run-out error. At this point, the production
conditions based on the component height may not be satisfied. Therefore, we recommend
that you select the option “Stop system on component run out” on the “Operation option”
menu when you select “Consider the component types and heights.”
2) Order placement from smallest to largest nozzle size:
When this item is checked off, components of the small-diameter nozzle are first placed at
optimization.
3) Specify group trays with same component type together
Regarding the same type tray components to be supplied to the MTC/MTS, specify whether
to arrange trays collectively or arrange them giving priority to the feed speed.
a) Group trays with same component type together:
Trays are arranged for each sane component type.
b) Arrange trays to optimize supply time:
Trays are arranged by giving priority to the feed speed.
Comp Type A
Comp Type A
A
Comp Type B
A
Comp Type C
Comp Type B
A
B
B
B
C
Comp Type C
A
C
B
C
C
When “Group trays with same
component type together” is
selected
Arrangement with supply
speed priority