SEMI E91-0600 © SEMI 1999 , 2000 6 No. Current St ate Trigger New State Action Comment 11 EXECUTING Process ing of the last wafer of a current lot comple ted. The prob er has received START comman d for next lot. SETT IN…

100%1 / 7923
SEMI E91-0600 © SEMI 1999, 20005
5.2.4 PSEM Processing State Transition Table
Table 1 Processing State Transition Table
No. Current State Trigger New State Action Comment
1 Undefined After turning the power
on, the operator has
commanded the prober to
perform initialization.
INIT The prober executes
initialization.
None
2 INIT Initialization of all
probers completes without
an alarm or error.
IDLE The prober is waiting for
a command by the host or
the operator.
None
3 IDLE Prober Job has been
created, and the prober
has already received a
process program and
materials, then has
received START
command from the host or
the operator.
SETTING UP The prober is set up
according to the process
program.
None
4 SETTING UP All set-up performance
has completed.
EXECUTING The prober executes
wafer transfer and
measuring.
None
5 EXECUTING Material processing
completes.
IDLE None None
6 PROCESS The prober received
STOP command.
STOPPING The prober completes the
current wafer or the
current die under
EXECUTING state and
unloads it in accordance
with the setting of ECV
“StopUnit”.
The prober starts clearing
data. Whether or not
unloading is executed after
the completion of the
current wafer or the
current die depends on the
specification.
7 PROCESS The prober received
ABORT command from
operator, host or self
generated.
ABORTING The prober is placed in a
safe state.
Wafer data or lot data may
be invalid or not available.
8 PROCESS An alarm occurs. ALARM
PAUSED
PROCESS activity is
suspended, the prober is
waiting for all alarms to
be cleared, STOP or
ABORT command.
ALARM PAUSED is
PAUSE sub-state.
9 PROCESS The prober received
PAUSE command from
the host or the operator.
PAUSING PROCESS state is
suspended when the
processing can be
stopped.
All operations required to
put the prober in safe
condition are performed.
PAUSING is PROCESS
PAUSE sub-state.
10 CHECKING Parameter checking ends
normally.
Previous
PROCESS
state.
Processing re-starts from
the previously suspended
state.
None
SEMI E91-0600 © SEMI 1999, 2000 6
No. Current State Trigger New State Action Comment
11 EXECUTING Processing of the last
wafer of a current lot
completed.
The prober has received
START command for
next lot.
SETTING UP None None
12 STOPPING The prober completes
clearing of data and no
alarm remains.
IDLE None None
13 PAUSING The prober stopped the
processing of the current
wafer which was in
EXECUTING state at a
possible stop breakpoint
and attained a safe state.
PAUSED The prober is waiting for
command (RESUME,
STOP or ABORT).
None
14 ALARM
PAUSED
Alarm is cleared. PAUSED The prober is waiting for
command (RESUME,
STOP or ABORT).
None
15 PROCESS
PAUSE
An alarm occurs in the
prober.
ALARM
PAUSED
The prober is waiting for
all alarms to be cleared,
STOP or ABORT
command.
None
16 PAUSED RESUME command was
received.
CHECKING Verification of process
program parameters.
Before continuing
processing, the host or
operator is required to
issue RESUME command.
17 PAUSED The operator instructed a
state transition.
PAUSED
SETTING UP
Probe card replacement
or inker replacement is
carried out by operator’s
instruction.
None
18 PAUSED
SETTING UP
The operator instructed a
state transition.
PAUSED None None
19 PAUSE The prober received
STOP command.
STOPPING The prober starts clearing
data.
Data is saved and valid.
20 PAUSE The prober received
ABORT command.
ABORTING If possible, unsafe
condition is reset.
Wafer data or lot data may
be invalid or not available.
21 STOPPING The prober received
ABORT command.
ABORTING If possible, unsafe
condition is reset.
Wafer data or lot data may
be invalid or not available.
22 ABORTING An abort performance has
completed.
IDLE None Only a state transition to
IDLE is permitted.
23 IDLE An alarm occurs. IDLE with
ALARMS
The prober is waiting for
all alarms to be cleared.
None
24 IDLE with
ALARMS
All alarms were cleared. IDLE None The IDLE state is free of
alarms.
25 IDLE The operator instructed a
state transition.
MAINTEN-
ANCE
None Maintenance and
inspection of the prober
modules and creation,
change and deletion of
process programs are
possible.
26 MAINTEN-
ANCE
The operator instructed a
state transition.
IDLE None None
SEMI E91-0600 © SEMI 1999, 20007
5.2.5 The Process Model Condition Table
5.2.5.1 Undermentioned Table 2 is an explanation of the transition condition of transition No. 10 in PSEM
Processing State Model diagram.
Table 2 The Process Model Condition Table
Conditions Next State
The check approves that the process program is changed. SETTING UP
The check approves that the process program is not changed.
The previous state was SETTING UP. SETTING UP
The previous state was EXECUTING. EXECUTING
5.3 Prober Job State Model
5.3.1 Purpose
5.3.1.1 The Prober Job state model is defined for the purpose of keeping track of its processing state of the material
to be processed by the prober in every material. The host can give instructions on how to process which material by
creating Prober Job to the equipment. Prober Job is created by the JOB CREATE command. Prober Job state exists
in each Prober Job. It occurs upon creation of Prober Job and is deleted upon its completion. The host can control
progress of material processing which is requested to the equipment according to an event report accompanied by
progress of Prober Job.
5.3.2 Prober Job State Model Diagram
JOB CREATED
JOB
STOPPING
JOB SET UP
JOB ACTIVE
JOB PROCESSING
4
Enter Processing
3 JOB Started
JOB
ABORTING
2
JOB
Canceled
8
Start Aborting
End
Aborting
6
Start
Stopping
9
7
End
Stopping
1
JOB Created
5 End Processing
Figure 3
Prober Job State Model Diagram
5.3.3 Description of Prober Job State
5.3.3.1 JOB CREATED — State where Prober Job is created to the equipment Prober Job has not processed yet. It
has nothing to do with whether material reached the equipment or not.
5.3.3.2 JOB ACTIVE — State where normal Prober Job processing operation is performed It consists of two sub-
states.
5.3.3.3 JOB SET UP (JOB ACTIVE Sub-state) — State that waits for condition to be ready for processing such as
Equipment preparation.
5.3.3.4 JOB PROCESSING (JOB ACTIVE Sub-state) — State where this processing is performed.