SEMI F27-0997 © SEMI 1997, 2003 4 7.1.1 Initial Dry Down — Start the experiment with the blank in place of the test specimen and a flo w of dry gas through th e APIMS. The APIMS output should be at equilibrium with the l…

SEMI F27-0997 © SEMI 1997, 2003 3
6.4 Moisture Pulse Generator — A valving arrangement capable of switching rapidly between dry and humidified
nitrogen is also required. An example of such a design is shown in Figure 1. In this design, flow is maintained in
both the humidified and dry gas lines at all times. By simultaneously switching valves V
1
and V
3
, or V
2
and V
3
,
either humidified or dry gas is directed through the test specimen while the other gas stream is directed to vent. Note
that there is a bypass loop so that flow can be maintained to the APIMS when the specimen is removed. In this
design, all gas lines, but especially those lines between V
1
and V
3
and between V
2
and V
3
, should be as short as
possible and constructed of EPSS tubing of high quality. Maintaining gas lines at a constant temperature between 50
and 80°C wherever possible is also recommended.
Figure 1
Moisture Test Schematic
6.4.1 The bypass loop will contain a stagnant volume of gas during testing. To avoid exposing the APIMS to a large
moisture upset whenever it is fed the gas contained in the bypass loop, the loop should be thoroughly baked out (at ≥
200°C) and protected from atmospheric contamination thereafter. Valve V
4
should be such that some flow can be
maintained through the bypass loop and the test specimen simultaneously as well as through each separately. Use of
pneumatic valves to facilitate rapid and simultaneous switching is recommended.
6.4.2 Other arrangements than that shown may also be used. The moisture pulse generator should be designed so as
to give the fastest possible response of the blank to a change in input moisture level.
6.4.3 Use of a glove box or other such enclosure about the test specimen and adjacent piping, to minimize exposure
of the system to ambient contamination when removing and introducing the test specimen, will improve the
precision of moisture content measurements but not of moisture interaction measurements. Use of such an enclosure
is, therefore, left to the discretion of the operator.
6.5 Temperature Control and Measurement — A stable temperature during the test is of critical importance. The
test component shall be kept at 35°C. TESTS AT DIFFERENT TEMPERATURES CANNOT BE
COMPARED. Ideally, the blank and device under test should be maintained in a temperature-controlled chamber.
However, if this is impractical, heating tape can be used. Temperature shall be measured at 1 m intervals on tubing.
Measurement at one point is adequate for small components. Temperature control should be to ± 1°C. A continuous
record of temperature during the test shall be maintained.
7 Procedure
7.1 Blank Tests — A blank test shall be carried out after each calibration. If initial dry-down testing of components
is not of interest, the initial dry-down test of the test blank may be omitted and the test blank brought to equilibrium
with zero gas in whatever manner is most convenient, except that the test blank should not be heated above 200°C.
Permanent changes in moisture interaction have been observed at temperatures above this level.

SEMI F27-0997 © SEMI 1997, 2003 4
7.1.1 Initial Dry Down — Start the experiment with the
blank in place of the test specimen and a flow of dry
gas through the APIMS. The APIMS output should be
at equilibrium with the lowest moisture level of interest,
and in any case no higher than 500 ppt. The flow rate
through the test blank should be set according to the
Flow Table (see Table 1).
7.1.1.1 Switch the gas flow to pass primarily through
the bypass loop while maintaining a small flow through
the test blank. Remove the test blank completely from
the system. If a glove box or other such enclosure is
used, do not remove the test blank from the glove box.
Immediately reconnect the test blank to V
4
, leaving it
disconnected from V
5
. Allow dry nitrogen to flow
through the test blank for five minutes to purge the air
from inside before reconnecting to V
5
. Switch the gas to
flow only through the blank and not through the bypass
loop. The APIMS will show an increase in moisture
concentration. Record the APIMS output until it
reaches 500 ppt or for 24 hours, whichever is less.
7.1.1.2 Repeat the above test twice for a total of three
data sets.
7.1.2 Moisture Input Test — After the APIMS has
returned to equilibrium with its initial moisture level,
switch the input gas to 50 ppb moisture (by switching
valves V
1
, V
2
, and V
3
simultaneously, if the
arrangement of Figure 1 is used) while recording the
APIMS response. Maintain this moisture input for 20
minutes. Switch the input to the test blank back to dry
nitrogen and record the decease in moisture level until
the initial background is again reached.
7.1.2.1 Repeat the above test twice for a total of three
data sets.
7.2 Tests on Actual Specimen
7.2.1 Initial Dry Down — This portion of the test is
designed to determine the quantity of removable
moisture on the wetted surfaces of a component in the
condition in which it is typically supplied. Thus, the
results of this test will reflect, by design, any
precautions which the supplier has taken to remove
moisture and maintain its dryness during shipping.
7.2.1.1 Start the test as in Section 7.1.1. The test
specimen should not be unpacked until after the APIMS
has equilibrated with the background moisture level. If
a glove box or other such enclosure is used, unpack the
component in the glove box. Switch the dry nitrogen
flow to pass through the bypass loop while maintaining
a small component through the test blank. Undo the
final layer of packing and any shipping caps or plugs on
the component at this point. Remove the sample blank
and connect the test specimen to valve V
4
as quickly as
possible. Allow the dry nitrogen flow to purge out any
ambient air in the specimen for five minutes, then
connect the specimen to V
5
. Switch the gas to flow only
through the test specimen and not through the bypass
loop. The APIMS will show an increase in moisture
concentration. Record the APIMS output until it
reaches 500 ppt or for 24 hours, whichever is less.
7.2.1.2 After 24 hours, the dry-down part of the test
can be terminated. If necessary, the moisture level can
be reduced below 500 ppt by baking the component at
200°C or the maximum temperature allowed by the
manufacturer for six hours and/or purging at the highest
flow of dry gas available. If this is not sufficient to
reduce the moisture concentration below 500 ppt, the
test may be abandoned.
7.2.2 Moisture Input Test — After the APIMS has
returned to equilibrium with its initial moisture level,
switch the input gas to 50 ppb moisture (by switching
valves V
1
, V
2
, and V
3
simultaneously, if the
arrangement of Figure 1 is used) while recording the
APIMS response. Maintain this moisture input for 20
minutes. Switch the input to the test blank back to dry
nitrogen and record the decease in moisture level until
the initial background is again reached.
7.2.2.1 Repeat the above test twice for a total of three
data sets.
7.2.2.2 In case the moisture level recorded by the
APIMS does not reach 50 ppb within 20 minutes, an
additional test should be performed in which the
moisture input should be continued until equilibrium is
reached. Then switch the input to the test specimen
back to dry nitrogen and record the decease in moisture
level until the initial background is again reached.
This test should be repeated once (two data sets total).
7.2.3 Bake-Out Test — Heat component to maximum
bake temperature, according to manufacturer’s
specifications, for three hours. Allow it to return to
room temperature. Continue by repeating the moisture
input test, after baking, as in Section 7.2.2.
7.3 Temperature, Flow Rate, and Pressure
Specification — The recommended test pressure is 700
kPa (7 bar). However, lower test pressures are
appropriate for some models of APIMS. Also, the
maximum pressure rating of the test components should
not be exceeded. The component temperature shall be
maintained at 35 ± 1°C during the test.
7.3.1 In the case of tubing, the test shall be carried out
at a single flow determined by the tubing diameter
according to the following table. In the case of valves,
regulators, mass flow controllers (MFC’s), and passive
components (gauges, flow meters, and fittings), the test
will be carried out at a single flow determined by the
table according to the size of the connecting tube stubs.

SEMI F27-0997 © SEMI 1997, 2003 5
Regulators should be tested in the fully-open condition
(i.e., with the regulator adjusted for minimum pressure
drop). The quantity of published data on regulator
interaction with moisture is limited, and experiments to
investigate the effect of varying the pressure drop
across the regulator are encouraged but are not part of
this test. MFC’s should be tested with a flow control
device upstream and the MFC not actively controlling
the flow through it (usually referred to as the “purge”
setting). It may not be possible to test a given MFC at
the specified flow if the flow rating of the MFC is much
less than the specified flow. As MFC’s are not expected
to vary greatly in performance according to their flow
rating, MFC’s to be tested should generally be chosen
to be compatible with the table. If this is not possible,
then the MFC should be tested at its rated flow (lower
than the flow in the table). This can then be considered
a conservative test, as the MFC operated at higher flow
would be expected to dry down more quickly.
7.3.2 Particle filters with the same size tubing
connectors often have somewhat different sizes and
very different flow ratings. In order to be able to make
reasonable comparisons between the performance of
different filters, it is essential to test filters of similiar
size at the same flow. However, the flow dependence of
the moisture response of particle filters is more
complex than that of tubing, and they must be tested at
more than one flow in order to model their behavior. In
order to meet this requirement and provide data which
can be readily compared with the conditions under
which the filters can be expected to be used in practice,
filters shall be tested at two flows: The first, according
to the size of the connecting tube stubs, the second, to
be 25% of the rated flow of the filter or 50 slm,
whichever is less.
7.3.3 For systems of components, the system shall be
tested at the lowest flow of those determined for each
component in the system considered separately. If the
system includes a filter, it shall be tested at that flow
and additionally, at 25% of the rated flow of the filter or
50 slm, whichever is less.
Table 1 Flow Rate
Tubing Outer Diameter
(nominal)
Flow (all
components)
Flow for Second
Test on Filters
≥ 1/8", < 1/2"
(≥ 3.2 mm, < 12.7 mm)
6 slm
≥ 1/2"
(≥ 12.7 mm)
13 slm
25% of rated flow
or 50 slm
whichever is less
8 Reporting Results
8.1 Complete moisture response curves for all test
specimens and relevant test blanks should be included.
A summary sheet may compare components in terms of
“induction time,” peak height, and/or decay time.
Temperature, pressure, and flow measurements, and as
complete a record as possible of all experimental
variables should be noted.
NOTICE: SEMI makes no warranties or
representations as to the suitability of the standards set
forth herein for any particular application. The
determination of the suitability of the standard is solely
the responsibility of the user. Users are cautioned to
refer to manufacturer’s instructions, product labels,
product data sheets, and other relevant literature
respecting any materials mentioned herein. These
standards are subject to change without notice.
The user’s attention is called to the possibility that
compliance with this standard may require use of
copyrighted material or of an invention covered by
patent rights. By publication of this standard, SEMI
takes no position respecting the validity of any patent
rights or copyrights asserted in connection with any
item mentioned in this standard. Users of this standard
are expressly advised that determination of any such
patent rights or copyrights, and the risk of infringement
of such rights, are entirely their own responsibility.
Copyright by SEMI® (Semiconductor Equipment and Materials
International), 3081 Zanker Road, San Jose, CA 95134. Reproduction o
f
the contents in whole or in part is forbidden without express written
consent of SEMI.