semi合集-English.pdf - 第6898页
SEMI S6-93 © SEMI 199 3 8 PROCESS EQUIPMENT EXHA UST REQUIREM ENT SUMMA RY (cont inued) Page 2 of 2 NOTE: Repeat th is sheet for each exhaust c on nection t o the machine. Manufacturer Equipm ent Name_________ __________…

SEMI S6-93 © SEMI 19937
APPENDIX 1
PROCESS EQUIPMENT EXHAUST REQUIREMENT SUMMARY
Page 1 of 2
Manufacturer
Equipment Name Model
Supplier Representative Date
Demand Status Normal Peak Other (Explain)
Doors, Hatches & Covers Closed % Open Removed
Chemical Location Chemical Contents Condition
1. ____________________ _____________________ ______Empty ______Full
2. ____________________ _____________________ ______Empty ______Full
3. ____________________ _____________________ ______Empty ______Full
4. ____________________ _____________________ ______Empty ______Full
5. ____________________ _____________________ ______Empty ______Full
6. ____________________ _____________________ ______Empty ______Full
Electrical Power ______On ______Off _______Disconnected
Equipment at Operating Temperature Yes ______No
Other Utilities On ______Off _______Disconnected
Process Material Positions ______Occupied ________Empty
Equipment Status at Time of Measurement
_______Up and at Idle _______Up and Ready to Start Cycle
_______Specific Point in the Process Cycle
(Explain)___________________________________________________________________________________
___________________________________________________________________________________________
_______Down for Installation/Modification _______Down for Cleaning
_______Down for Preventive Maintenance _______Down for Repair

SEMI S6-93 © SEMI 1993 8
PROCESS EQUIPMENT EXHAUST REQUIREMENT SUMMARY (continued)
Page 2 of 2
NOTE: Repeat this sheet for each exhaust connection to the machine.
Manufacturer
Equipment Name________________________________________________ Model
Demand Status __________________Normal ___________Peak ____________Other (Explain)__________
Duct Connection Identity
Connection Inside Diameter_____________________________________________centimeters (inches)
Connection Outside Diameter____________________________________________centimeters (inches)
*Priority Target Tolerance Stability
Flow Volume m/s (CFM) _______ ______ -0% +______% ±_______%
Flow Velocity m/s (FPM) _______ ______ -0% +______% ±_______%
Static Pressure _______ ______ -0% +______% ±_______%
pascals (inches of water)
Data Corrected to Sea Level ______Yes ______No
Data Corrected to Std Air Density ______Yes ______No
Exhaust Stream Temperature ______°C (°F) ______°C (°F) ______°C (°F)
Min Normal Max
Measurement Location
Altitude____________m (ft) ambient temperature____________°C (°F) Humidity
Chemical Make-up of Expected Effluent Stream
Element State % Concentration Volume Weight
___________ ________ ________________ ________ ______
___________ ________ ________________ ________
___________ ________ ________________ ________
___________ ________ ________________ ________
___________ ________ ________________ ________
Exhaust Schematic Diagram Included _______Yes _______No
* Priority is the rank order importance (from one to four) of the indicated value in proper operation of the
equipment. The balance will adjust to priority one values at the expense of other values in this sheet.

SEMI S6-93 © SEMI 19939
APPENDIX 2
REFERENCED DOCUMENTS
A2-1 Industrial Ventilation
A Manual of Recommended Practice
20th EditionCopyright 1988
Library of Congress Catalog Card Number: 62-12929
Published by: ACGIH (American Conference of
Government Industrial Hygienists)
6500 Glenway Ave., Building D-7
Cincinnati, OH 45211-4438
Telephone: 513-661-7881
A2-2 HVAC Systems Duct Design
1981 Second Edition
Published by: SMACNA (Sheet Metal and Air
Conditioning Contractors’ National Association, Inc.)
8224 Old Courthouse RoadTyson’s Corner
Vienna, VA 22183
Telephone: 703-790-9890
A2-3 HVAC Systems
Testing, Adjusting, and Balancing
Third Printing - June 1986
Published by: SMACNA (Sheet Metal and Air
Conditioning Contractors’ National Association, Inc.)
A2-4 Procedural Standards for Certified
Testing of Cleanrooms
First Edition — October 1988
Published by: NEBB (National Environmental
Balancing Bureau) 8224 Old Courthouse Road Tyson’s
Corner Vienna, VA 22180
A2-5 Threshold Limit Values for Chemical
Substances and Physical Agents and
Biological Exposure Indices
Published by: ACGIH
A2-6 AABC National Standards for Field
Measurement and Instrumentation — Total
System Balance
Volume Two, No. 12173
Published by: AABC (Associated Air Balance Council)
1518 K Street Northwest
Suite 503
Washington, D.C. 20005
Telephone: 202-737-0202
A2-7 ASHRAE 1981 Fundamentals Handbook
Chapter 33 Duct Design
Published by: ASHRAE (American Society of
Heating, Refrigerating, and Air Conditioning
Engineers, Inc.)
1791 Tullie Circle, N.E.Atlanta, GA 30329
Telephone: 404-636-8400
A2-8 SEMI S2, Safety Guidelines for
Semiconductor Manufacturing Equipment
Published by: SEMI (Semiconductor Equipment and
Materials International)
3081 Zanker Road
San Jose, CA 95134
Telephone: 408-428-9600
A2-9 SEMI F15, Test Method for Enclosures
Using Sulfur Hexafluoride Tracer Gas and Gas
Chromatography
Published by: SEMI