SEMI E70-1103 © SEMI 1998, 2003 4 that come on line wh en the main utility pow er supply fails. 5.1.28 equi pment engineeri ng — a group that foc uses primaril y upon the electri cal, electronic, and mechanical character…

SEMI E70-1103 © SEMI 1998, 2003 3
4.3.3 Roles and Responsibilities for SEMI E51 —
Facilities engineer and installation manager submit
utility specifications requested in SEMI E51 matrixes,
either typical or site-specific. Tool supplier uses
information provided about facility to assist in
configuration of the process tool.
5 Terminology
5.1 Definitions
5.1.1 acceleration cost — additional costs incurred to
complete the project sooner than the original scheduled
baseline plan.
5.1.2 as-built drawings — documentation describing
the actual configuration and dimensions at the end of
construction.
5.1.3 base build — installation of base building,
services, and equipment to establish functional
environmental controls and utilities to support
production equipment installation.
5.1.4 bidding — obtaining sealed quotes for a defined
scope of work.
5.1.5 burdened/unburdened — identification of costs
included or excluded from contractual labor rates.
5.1.6 capital equipment — equipment that is
depreciated according to tax guidelines for durable
goods. Generally has a value greater than $ 1,000.00 and
a useful life greater than 5 years.
5.1.7 change order — a document defining a formal
change in drawings, specifications, and/or scope of
work.
5.1.8 cleanroom — confined area in which the
humidity, temperature, particulate matter, and
contamination are precisely controlled within specified
parameters. Cleanroom classes are defined in
ISO 14644.
5.1.9 conditioned power — electrical power that is
manipulated to maintain specified tolerances.
5.1.10 construction — the set of activities that
transforms plans and specifications into functional
systems capable of performing to specification.
5.1.11 construction consumable — any material used
up during construction.
5.1.12 construction management — the set of activities
that define, direct, monitor, and report construction
activities such as workmanship, adherence to design,
cost, and schedule conformance.
5.1.13 contingency — a reserve of funds, time, and/or
material that is allocated to maintain schedule and
budget. A reserve for scope changes, unforeseen site
conditions, change in material prices, or unanticipated
events.
5.1.14 contract award — notification to the successful
bidder and subsequent signing of contract documents.
5.1.15 contractor — a licensed company hired to
accomplish a contractually specified scope of work.
5.1.16 cost of ownership (COO) — the total lifetime
cost associated with acquisition, installation, and
operation of fabrication equipment [SEMI E35].
5.1.17 cycle time, gross installation — total time to
install and commission process equipment, typically
starting from dock date to release for vendor startup.
5.1.18 cycle time, net installation — actual time
devoted to construction activities related to tool hookup
from dock date to ready for inspection.
5.1.19 damage — destruction or unintentional
alteration resulting in a liability.
5.1.20 dedicated truck — exclusive drayage of a
shipment.
5.1.21 design build — a contract method whereby the
contractor assumes responsibility for design generation
and construction to accomplish a specified performance
criteria.
5.1.22 design start — a milestone event that designates
the initial conversion of equipment specifications and
design concepts into engineering plans and
specifications.
5.1.23 detailing — generation of dimensioned shop
fabrication plans based on process and instrumentation
drawings (P&ID), field surveys, and configuration
verifications.
5.1.24 direct/indirect cost — direct costs are the cost of
anything physically associated with the installation,
removal, or modification of equipment. Indirect costs
cannot be associated with a specific piece of equipment.
Profit, overhead, and administrative costs are typically
considered indirect.
5.1.25 distribution system — the collection of
subsystems and components used in a semiconductor
manufacturing facility to control and deliver process
chemicals from source to point of use for wafer
manufacturing processes.
5.1.26 dock date — the date when the fab equipment,
including all ancillary components, is on-site at the
loading dock.
5.1.27 emergency power — electrical power supplied
by alternate sources or backup systems, like generators

SEMI E70-1103 © SEMI 1998, 2003 4
that come on line when the main utility power supply
fails.
5.1.28 equipment engineering — a group that focuses
primarily upon the electrical, electronic, and
mechanical characteristics of production equipment.
Depending upon the site and the fab area, Equipment
Engineering may be a distinct organization, or the
equipment engineering responsibilities may be handled
by other groups, such as Process Engineering or
Manufacturing Engineering. Equipment Engineering is
typically responsible for selection and physical
configuration of production equipment.
5.2 facilities interface specification — Documentation
provided by a tool supplier that contains the tool
requirements for utilities and installation as defined in
SEMI E6. So-called equipment data sheets are one
section of this document that also includes requirements
for safety, facilities services, shipping and receiving,
install, startup, acceptance, and training.
5.2.1 fast track — a scheduling method that eliminates
float and maximizes parallel activities, thereby reducing
overall project duration. Selective use of overtime is
typically used to reduce the duration of critical path
activities.
5.2.2 field change order — a document defining a
formal change in drawings, specifications, and/or scope
of work generated after contract award by on-site
personnel to incorporate conditions identified during
construction.
5.2.3 field fabrication — assembly and/or modification
of components on the job site to accommodate site-
specific conditions.
5.2.4 float — unallocated time created when tasks are
completed ahead of schedule or a task’s duration is less
than the allotted amount.
5.2.5 free on board (FOB) — goods placed on a truck
or other means of transportation at a point specified by
the seller without charge to the buyer, but with all
further transportation at the buyer’s expense.
5.2.6 gas cabinet — a metal enclosure that is intended
to provide local exhaust ventilation, protection for the
gas cylinder from fire from without the cabinet, and
protection for the surroundings from fire from within
[SEMI S4].
5.2.7 gas interface box (GIB) — an enclosure located
between the tool mainframe and facility services
containing components for pressure regulation and
filtration. Functions to consolidate all gas requirements
to single points of connection. Provides location and
ability to pre-facilitate tool hookups in advance of tool
delivery.
5.2.8 grounding — electrical wiring system to provide
earth ground.
5.2.9 hookup — the set of activities and organization
required to accept incoming process equipment, move it
into place, connect the equipment to all facilities, and
test the connections. The connection of all necessary
facilities and interconnects required to make the
equipment package fully operational. The hookup
activity is complete when all of the following are met.
• The equipment positioning and bolting down is
complete.
• The final equipment utility connections and
interconnects are complete, tested, and certified.
• The process piping certification is complete. The
wall system, including bulkheads as required, is
complete.
• The final decontamination is complete.
• Government inspections have been conducted as
required.
5.2.10 inertia base — a structural unit using mass
damping to attenuate vibration for production
equipment.
5.2.11 interconnect — connections between tool
mainframe and peripheral tool subsystem equipment
[SEMI E6].
5.2.12 issue for construction (IFC) — a milestone
event that identifies when drawings and specifications
are released to subcontractors for construction.
5.2.13 labor rate — the contractually stipulated cost of
labor.
5.2.14 laterals/sublaterals — intermediate facility
service distribution lines that run between mains and
equipment-specific isolation valves.
5.2.15 layout fixed — the milestone date when the
physical layout of equipment and components is fixed
and all stockholders complete approval sign-off.
5.2.16 local abatement — treatment of emissions at the
point of generation at the tool.
5.2.17 long lead materials — material requiring early
ordering due to availability or long manufacturing time.
5.2.18 mains/submains — central distribution lines
from a facility services source to which laterals are
connected. Individual equipment is not connected
directly to mains.
5.2.19 minienvironment — a localized environment
created by an enclosure to isolate the product from
contamination and people [SEMI E45].

SEMI E70-1103 © SEMI 1998, 2003 5
5.2.20 mobilization — initial assignment of resources
to a project resulting in measurable work being
accomplished.
5.2.21 move-in — the movement of the process
equipment from the loading dock into the fab area, and
into the final taped position. The piece of equipment is
defined as the main body of the equipment and all its
subsystems, assemblies, and components, excluding the
hookup. If major subsystems such as pumps or chillers
are missing, move-in will not be considered complete
until they arrive.
5.2.22 move-in date — milestone date indicating
completion of step when processing equipment is
moved into designated location in fab.
5.2.23 not-to-exceed (NTE) — an agreement to
guarantee that the charges for a service or services will
not be greater than a specified amount.
5.2.24 on-the-job training (OJT) — the instruction of
personnel in the operation or maintenance, or both, of
equipment done during the course of normal work
functions. On-the-job training typically does not
interrupt operation or maintenance activities and,
therefore, can be included in any equipment state
without special categorization [SEMI E10].
5.2.25 overtime — time spent in excess of normal
working hours.
5.2.26 owner buys — material purchased by the owner
and consigned to subcontractors for use in construction.
5.2.27 pedestal — structural support element upon
which equipment or raised floor rests.
5.2.28 permits — legal governmental documents
granting permission for specific construction activities.
5.2.29 prefacilitation — a stage in the equipment
installation process that follows base build and precedes
tool hookup. Prefacilitation brings the various facilities
services close to the new equipment location, including
new facilities services and structural modifications
required to prepare the facility to accept the equipment.
Also known as rough-in, this step is performed as a
time-saving operation. The activity requires the
following conditions to be met:
• The raised floor is in (if required).
• The ceiling is in.
• The seismic or isolation frame is in.
• All utilities are within 1.8 meters (6 feet) of the
equipment or terminated in a utility box.
• The floor is taped with the equipment location.
5.2.30 prepurchase — purchase of materials and
equipment in advance of total scope definition to
accommodate long lead times.
5.2.31 process and instrumentation drawing (P&ID)
— a diagram using graphic engineering symbols to
represent the components, flows, and functions that
make up a process delivery system.
5.2.32 project management — the set of activities that
design, define, direct, monitor, and report on factory
building construction.
5.2.33 protocol — description of procedures, materials,
and practices used to define a methodology for
accomplishing a specific task. Typically refers to
material and personnel handling to maintain cleanroom
integrity.
5.2.34 punch list — a list of corrective actions required
to fulfill contractual obligations.
5.2.35 purchase order (P.O.) — a document used by a
buyer to acquire a product or service that usually
contains the terms and conditions (including price)
governing the sale.
5.2.36 qualification — certification of compliance with
contractual stipulations before release to manufacturing
production use.
5.2.37 quality assurance/quality control (QA/QC) —
activities performed to ensure compliance with
contractually stipulated conditions.
5.2.38 raised floor — the removable floor system
installed above the actual building floor within
cleanroom environments to control air flow and allow
access for utility routing and connection.
5.2.39 request for information (RFI) — documentation
from contractor to request clarification.
5.2.40 request for proposal (RFP) — documentation
from purchasing agent to vendor to request a proposal
to provide product and/or services.
5.2.41 request for quote (RFQ) — documentation from
purchasing agent to vendor to request a firm price to
provide product and/or services.
5.2.42 seismic bracing — structural reinforcement to
minimize damage due to earthquakes.
5.2.43 shifts — duration of routine work day, typically
an 8, 10, or 12 hour as required to accrue a minimum of
40 equivalent hours (or local equivalent) within a 7-day
(one week) period.
5.2.44 single line drop — a hookup strategy where a
piece of processing equipment has only one point of
connection per facility service. All manifolding for an
individual service is handled with in the tool.